Validations Queue
47,884 candidate doc → node links pending adjudication. Each was auto-generated by cosine similarity ≥ 0.55 between document and prediction embeddings (bge-base-en-v1.5, 768-dim). Showing page 2 of 3, 50 rows by similarity. Adjudicating updates doc_node_links.reviewed=true with the chosen polarity, writes per-link rows to audit_log, and removes the row from this queue. Phase 4 inference will use confirmed corroborates/contradicts links as Bayesian evidence.
Pending (total)
47,884
Reviewed
13
Filtered
134
page 2 / 3
Showing on page
50
Filters
URL params control source + min-similarity threshold
Bulk auto-confirm by similarity threshold
Confirm or label (corroborates / contradicts) all unreviewed links above a similarity threshold in one transaction. Each affected row writes a per-link audit_log entry. Capped at 1,000 links per call. Use Preview first.
Source0 selected · 0 visible
Bulk action
| Sim | Doc | Source | Pred | Domain | Prior | |
|---|---|---|---|---|---|---|
| 0.75 | codex_research_pack 2026-04-29 | 229_016 Figure will scale manufacturing from thousands to tens of thousands to hundreds of thousands to millions of robots per year. Brett Adcock | Robotics | 37% | ||
| 0.75 | codex_research_pack 2025-03-16 | 229_014 Figure will be able to make millions of robots via BotQ and future BotQ expansion. Brett Adcock | Robotics | 35% | ||
| 0.75 | codex_research_pack 2025-03-16 | 229_015 The current Figure facility will top out around 50,000 units per year at full capacity. Brett Adcock | Robotics | 43% | ||
| 0.75 | codex_research_pack 2025-03-16 | 229_016 Figure will scale manufacturing from thousands to tens of thousands to hundreds of thousands to millions of robots per year. Brett Adcock | Robotics | 37% | ||
| 0.75 | codex_research_pack 2026-04-30 | SEM_041 At least 100,000 personal AI robots will be preordered in 2025 (driven by speech/vision/dexterity advances). Brett Adcock | Robotics | 42% | ||
| 0.75 | codex_research_pack 2026-01-12 | SEM_041 At least 100,000 personal AI robots will be preordered in 2025 (driven by speech/vision/dexterity advances). Brett Adcock | Robotics | 42% | ||
| 0.75 | codex_research_pack 2026-03-01 | 246_013 Artemis 4 crewed moon landing mission to south pole in early 2028. Peter Diamandis | Space | 42% | ||
| 0.75 | codex_research_pack 2026-03-01 | 246_013 Artemis 4 crewed moon landing mission to south pole in early 2028. Peter Diamandis | Space | 42% | ||
| 0.75 | codex_research_pack 2026-04-01 | 246_013 Artemis 4 crewed moon landing mission to south pole in early 2028. Peter Diamandis | Space | 42% | ||
| 0.75 | codex_research_pack 2025-03-31 | 247_041 AI-powered drugs have 85% phase 1 success vs 52% traditional Peter Diamandis | Biotech/Longevity | 55% | ||
| 0.75 | codex_research_pack 2025-03-04 | 245_007 Colossal will bring back the woolly mammoth Ben Lamm | Biotech/Longevity | 45% | ||
| 0.75 | codex_research_pack 2025-04-07 | 245_007 Colossal will bring back the woolly mammoth Ben Lamm | Biotech/Longevity | 45% | ||
| 0.75 | codex_research_pack 2026-04-30 | 245_007 Colossal will bring back the woolly mammoth Ben Lamm | Biotech/Longevity | 45% | ||
| 0.70 | codex_research_pack 2025-03-19 | COD_AI_004 Frontier agents reach one-workday autonomous task horizon by end 2027 Codex Research Pack | AI | 36% | ||
| 0.70 | codex_research_pack 2026-04-26 | COD_AI_004 Frontier agents reach one-workday autonomous task horizon by end 2027 Codex Research Pack | AI | 36% | ||
| 0.70 | codex_research_pack 2026-01-06 | COD_AI_001 Vera Rubin becomes commercially available across major cloud and OEM partners by H2 2026 Codex Research Pack | Technology | 51% | ||
| 0.70 | codex_research_pack 2026-03-16 | COD_AI_001 Vera Rubin becomes commercially available across major cloud and OEM partners by H2 2026 Codex Research Pack | Technology | 51% | ||
| 0.70 | codex_research_pack 2026-03-16 | COD_AI_002 At least one 1 GW Vera Rubin frontier-training cluster reaches deployment by Q1 2027 Codex Research Pack | AI/Compute | 40% | ||
| 0.70 | codex_research_pack 2026-03-16 | COD_TECH_001 A16/N2-class TSMC process availability materially supports 2027 AI accelerator ramps Codex Research Pack | Semis | 50% | ||
| 0.70 | codex_research_pack 2026-04-28 | COD_AI_003 EU AI Act GPAI enforcement powers begin on 2026-08-02 without a blanket delay Codex Research Pack | Geopolitics | 40% | ||
| 0.70 | codex_research_pack 2026-04-28 | COD_AI_003 EU AI Act GPAI enforcement powers begin on 2026-08-02 without a blanket delay Codex Research Pack | Geopolitics | 40% | ||
| 0.70 | codex_research_pack 2026-04-29 | COD_ROB_001 Figure sustains a one-robot-per-hour Figure 03 production run-rate for at least 30 consecutive days by Q4 2026 Codex Research Pack | Robotics | 31% | ||
| 0.70 | codex_research_pack 2026-04-29 | COD_ROB_003 At least two humanoid vendors exceed 1,000 cumulative deployed robots by end 2027 Codex Research Pack | Robotics | 33% | ||
| 0.70 | codex_research_pack 2025-03-16 | COD_ROB_001 Figure sustains a one-robot-per-hour Figure 03 production run-rate for at least 30 consecutive days by Q4 2026 Codex Research Pack | Robotics | 31% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_ROB_002 1X ships first paid NEO Early Access units to US homes in 2026 Codex Research Pack | Robotics | 31% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_ROB_003 At least two humanoid vendors exceed 1,000 cumulative deployed robots by end 2027 Codex Research Pack | Robotics | 33% | ||
| 0.70 | codex_research_pack 2026-01-12 | COD_ROB_002 1X ships first paid NEO Early Access units to US homes in 2026 Codex Research Pack | Robotics | 31% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_ROB_003 At least two humanoid vendors exceed 1,000 cumulative deployed robots by end 2027 Codex Research Pack | Robotics | 33% | ||
| 0.70 | codex_research_pack 2026-03-01 | COD_SPC_001 Artemis III flies as an Earth-orbit HLS/EVA suit test mission in 2027, not a lunar landing Codex Research Pack | Space | 44% | ||
| 0.70 | codex_research_pack 2026-03-01 | COD_SPC_002 The next US crewed lunar surface landing occurs on Artemis IV in 2028 Codex Research Pack | Space | 22% | ||
| 0.70 | codex_research_pack 2026-03-01 | COD_SPC_002 The next US crewed lunar surface landing occurs on Artemis IV in 2028 Codex Research Pack | Space | 22% | ||
| 0.70 | codex_research_pack 2026-03-01 | COD_SPC_003 SpaceX completes large-scale Starship vehicle-to-vehicle cryogenic propellant transfer by end 2026 Codex Research Pack | Space | 42% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_SPC_004 Europa Clipper completes Earth gravity assist in December 2026 Codex Research Pack | Space | 48% | ||
| 0.70 | codex_research_pack 2025-09-08 | COD_SPC_005 NASA Dragonfly launches on Falcon Heavy in the July 2028 window Codex Research Pack | Space | 33% | ||
| 0.70 | codex_research_pack 2025-11-13 | COD_SPC_007 NASA ESCAPADE arrives at Mars in fall 2027 after 2026 Earth gravity assist Codex Research Pack | Space | 43% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_SPC_006 Vast Haven-1 reaches orbit by end 2026 Codex Research Pack | Space | 52% | ||
| 0.70 | codex_research_pack 2025-01-06 | COD_BIO_001 FDA finalizes or materially advances AI-for-drug-submission guidance by end 2026 Codex Research Pack | Biotech/Longevity | 47% | ||
| 0.70 | codex_research_pack 2025-03-31 | COD_BIO_002 An AI-designed Isomorphic or peer drug enters or completes Phase 1 by end 2027 Codex Research Pack | Biotech/Longevity | 50% | ||
| 0.70 | codex_research_pack 2025-03-04 | COD_BIO_003 Colossal completes mammoth embryo transfer into an elephant surrogate by end 2027 Codex Research Pack | Biotech/Longevity | 20% | ||
| 0.70 | codex_research_pack 2025-03-04 | COD_BIO_004 Colossal produces a live mammoth-like elephant calf by end 2028 Codex Research Pack | Biotech/Longevity | 12% | ||
| 0.70 | codex_research_pack 2025-04-07 | COD_BIO_005 Colossal adds at least one more de-extinction species to active embryo-transfer pipeline by end 2028 Codex Research Pack | Biotech/Longevity | 47% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_BIO_003 Colossal completes mammoth embryo transfer into an elephant surrogate by end 2027 Codex Research Pack | Biotech/Longevity | 20% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_BIO_004 Colossal produces a live mammoth-like elephant calf by end 2028 Codex Research Pack | Biotech/Longevity | 12% | ||
| 0.70 | codex_research_pack 2026-04-30 | COD_BIO_005 Colossal adds at least one more de-extinction species to active embryo-transfer pipeline by end 2028 Codex Research Pack | Biotech/Longevity | 47% | ||
| 0.55 | codex_research_pack 2025-03-19 | AUT_009 'Powerful AI' (functional AGI) arrives 2026-2027 — data centers house a 'nation of geniuses' consisting of millions of highly specialized autonomous agents operating orders of magnitude faster than human counterparts; entire software development lifecy... Dario Amodei | AI | 22% | ||
| 0.55 | codex_research_pack 2025-03-19 | ROB_005 True AGI requires 'physical intelligence' — an AGI system must be able to control a robotic chassis to play sports or perform complex physical manipulations at amazing levels to truly mirror human brain architecture; software alone cannot achieve full ... Demis Hassabis | Robotics | 47% | ||
| 0.55 | codex_research_pack 2026-04-26 | AUT_009 'Powerful AI' (functional AGI) arrives 2026-2027 — data centers house a 'nation of geniuses' consisting of millions of highly specialized autonomous agents operating orders of magnitude faster than human counterparts; entire software development lifecy... Dario Amodei | AI | 22% | ||
| 0.55 | codex_research_pack 2026-04-26 | ROB_005 True AGI requires 'physical intelligence' — an AGI system must be able to control a robotic chassis to play sports or perform complex physical manipulations at amazing levels to truly mirror human brain architecture; software alone cannot achieve full ... Demis Hassabis | Robotics | 47% | ||
| 0.55 | codex_research_pack 2025-01-21 | INF_050 Within approximately 6-7 years (2031-2032), major tech companies will operate their own small modular nuclear reactors (SMRs) co-located directly with AI data centers — in the hundreds-of-megawatts range, bypassing the public grid entirely. Jensen Huang | Energy | 39% | ||
| 0.55 | codex_research_pack 2025-07-22 | INF_050 Within approximately 6-7 years (2031-2032), major tech companies will operate their own small modular nuclear reactors (SMRs) co-located directly with AI data centers — in the hundreds-of-megawatts range, bypassing the public grid entirely. Jensen Huang | Energy | 39% |