← Cockpit
INF_050predictionEnergySMR-co-location

Within approximately 6-7 years (2031-2032), major tech companies will operate their own small modular nuclear reactors (SMRs) co-located directly with AI data centers — in the hundreds-of-megawatts range, bypassing the public grid entirely.

Predictor: Jensen Huang

Prior probability
60.0%
Current probability
38.7%
evolves via intake + LBP
Conviction
4/5
Signal quality
A
Resolution
in_progress
Window
2031-01-01 – 2032-11-30
Edges in / out
2 / 0
Tickers exposed
28

Prediction text

Within approximately 6-7 years (2031-2032), major tech companies will operate their own small modular nuclear reactors (SMRs) co-located directly with AI data centers — in the hundreds-of-megawatts range, bypassing the public grid entirely. | First hyperscaler-owned SMR groundbreaking

Key catalyst: First hyperscaler-owned SMR groundbreaking

Watch events: Kairos first operating license (2027-28 target); Oklo Aurora deployment; NuScale VOYGR orders

Resolution evidence

Status: in_progress

Alphabet/Kairos 500 MW (2030 target); AWS-Talen 960 MW nuclear PPA; Oracle 1 GW three-SMR site announced; Microsoft Three Mile Island PPA.

Predictor: Jensen Huang

κ + Brier as of 2026-05-22
κ (discount)
0.808
Brier
0.0128
excellent
Hits / Misses
6 / 0
of 8 resolved
Hit rate
75.0%
Calibration plot (stated vs observed)

Evidence about this node from Jensen Huang is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).

Reference class: energy_grid_rebuild_5y

Linked via embedding similarity 0.609

Major grid expansion (>50GW) within 5y of announce

Base rate
50.0%
3/6 historical
Inside weight
Outside weight
no pull
inside 38.7% → blend 38.7% 0.0pp)

Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.

Probability over time

7 prob_history rows
0%25%50%75%100%prior 60%2026-04-302026-04-302026-05-17
intake v2milestone miss sweeplbp propagationreference class assignedlegacy v1prior_prob (analyst seed)current = 38.7%

Milestone chain

Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.
Leading chain: 4 pending
  1. 2031-05-03pendingQ1 window check-in (25%)
  2. 2031-09-02pendingQ2 window check-in (50%)
  3. 2032-01-02pendingQ3 window check-in (75%)

No downstream cascades — this prediction is a leaf in the dependency graph.

What if this resolves?

Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 39%)

Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"

Evidence chain

Every probability update with full Bayesian provenance — chronological, latest first
LBP2026-05-17T02:00:01Z38.7%-1.2pp
Network propagation: 39.9% → 38.7%
5-iter LBP, residual 0.00689 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run e607fa96
LBP2026-05-10T02:00:02Z39.9%-2.4pp
Network propagation: 42.3% → 39.9%
6-iter LBP, residual 0.00584 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run e5c18d29
LBP2026-05-03T02:00:01Z42.3%-4.8pp
Network propagation: 47.0% → 42.3%
6-iter LBP, residual 0.00677 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run 1a683ac9
LBP2026-04-30T16:39:51Z47.0%-6.0pp
Network propagation: 53.0% → 47.0%
5-iter LBP, residual 0.00825 · damping 0.5, w_intrinsic 0.5 · method lbp_v2 · run 0c8a4ea3
legacy v12026-04-30T16:13:50Z53.0%+6.0pp
reference_class_assigned bayesian_v2 inside=0.600 blend=0.530 w_in=0.30 energy_grid_rebuild_5y
LBP2026-04-30T02:18:57Z47.0%-6.0pp
Network propagation: 53.0% → 47.0%
5-iter LBP, residual 0.00825 · damping 0.5, w_intrinsic 0.5 · method lbp_v1 · run 592311ef
legacy v12026-04-30T01:56:50Z53.0%-7.0pp
reference_class_assigned bayesian_v2 inside=0.600 blend=0.530 w_in=0.30 energy_grid_rebuild_5y

Network propagation neighbors

Top edges sorted by latest LBP cross-impact
All propagation →

Top incoming (parents)

Edges that influence THIS node's belief

KindNodeTheir probP(c|s=T)P(c|s=F)Δ implied
killerTK09
Energy Grid Cap (Data Center Power Wall)
35.0%0.0500.600+0.020

Top outgoing (children)

Predictions THIS node influences

No outgoing edges.

Ticker exposure

28 ticker(s) linked

Beneficiaries (22)

FCELXEOKLOCRWVLEULTBRWULFBLDPNNESMREQIXAEPAMZNBECEGDGEVGOOGLMETAMSFTRYCEYVST

Prerequisites (2)

Predictions that must hit first
TypePredTitleDomainLag
correlateS_COMPUTE_100GW_2030Compute: 100GW national-scale by Dec 2030compute_scale
killerTK09Energy Grid Cap (Data Center Power Wall)

Dependents (0)

Predictions enabled by this
TypePredTitleDomainLag
No dependents

Validations (1)

Resolution events
Observed atStatusByNotes
2026-04-29partialthesis_timeline_v1.0_importAlphabet/Kairos 500 MW (2030 target); AWS-Talen 960 MW nuclear PPA; Oracle 1 GW three-SMR site announced; Microsoft Three Mile Island PPA.

Linked documents (7)

Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
SimSourceTitleMarket probPolarityReviewedPublished
0.682arxivNeural Operator-Based Surrogate Model for CFD:Helical Coil Steam Generator in Small Modular Reactormentionspending2026-05-28
0.595edgar_8kNano Nuclear Energy Inc. (NNE) (CIK 0001923891)mentionspending2026-05-15
0.595edgar_8kNano Nuclear Energy Inc. (NNE) (CIK 0001923891)mentionspending2026-05-29
0.591edgar_8kNUSCALE POWER Corp (SMR) (CIK 0001822966)mentionspending2026-06-02
0.550codex_research_packOpenAI - Announcing The Stargate Projectcorroboratespending2025-01-21
0.550codex_research_packOpenAI - Stargate advances with 4.5 GW partnership with Oraclecorroboratespending2025-07-22
0.550codex_research_packSoftBank - OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sitescorroboratespending2025-09-24

Raw metadata

From Thesis_Timeline_v1.0_FINAL workbook
{
  "nia": false,
  "qty": "hundreds of MW",
  "mode": "FORECAST",
  "role": "Cited-CEO",
  "context": "Huang framing positions tech giants as primary energy providers. Alphabet has already ordered 500 MW from Kairos (targeting 2030 deployment). Pairs with INF_045 (MS $1.5T nuclear) and INF_054 (Valar Gigasite).",
  "to_year": 2032,
  "conv_cues": "specific 6-7 year timeline; explicit co-location",
  "direction": "HAPPEN",
  "from_year": 2031,
  "timeframe": "2031-2032",
  "conv_level": "HIGH",
  "milestones": [
    {
      "kind": "scenario_signal",
      "label": "Scenario fires: Compute: 100GW national-scale by Dec 2030",
      "status": "pending",
      "weight": 0.7,
      "ordinal": -4,
      "source_id": "S_COMPUTE_100GW_2030",
      "expected_date": "2030-12-31",
      "observed_date": null
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q1 window check-in (25%)",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -3,
      "source_id": null,
      "expected_date": "2031-05-03",
      "observed_date": null
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q2 window check-in (50%)",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -2,
      "source_id": null,
      "expected_date": "2031-09-02",
      "observed_date": null
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q3 window check-in (75%)",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -1,
      "source_id": null,
      "expected_date": "2032-01-02",
      "observed_date": null
    },
    {
      "kind": "event",
      "label": "Within approximately 6-7 years (2031-2032), major tech companies will operate their own small modular nuclear reactors (SMRs) co-located dir",
      "status": "pending",
      "weight": 1,
      "ordinal": 0,
      "source_id": "INF_050",
      "expected_date": "2032-05-03",
      "observed_date": null
    }
  ],
  "repeat_eps": 1,
  "affiliation": "NVIDIA",
  "attribution": "FIRST_PERSON",
  "granularity": "YEAR_RANGE",
  "source_refs": "9",
  "target_date": "2031-06-15T00:00:00",
  "display_date": "2032-05-03",
  "episode_date": "2026-04-21T00:00:00",
  "key_catalyst": "First hyperscaler-owned SMR groundbreaking",
  "parse_method": "YEAR_RANGE midpoint",
  "domain_bucket": "Energy",
  "episode_title": "The Paradigm Shift in Global Power: Nuclear, Solar, Battery & EV-Charging Predictions (2023-2026)",
  "flag_repeated": false,
  "in_5yr_window": false,
  "source_report": "Energy Predictions Research Plan.md (2026-04-21)",
  "appears_in_eps": "INF-RPT",
  "futurist_phase": "Phase 3 (2029+)",
  "is_macro_claim": false,
  "total_mentions": 1,
  "priority_weight": 5,
  "ps_cluster_tags": [
    "C3",
    "C4"
  ],
  "report_evidence": "Anchor section: Small Modular Reactors and Corporate Micro-Grids.",
  "active_end_month": "2032-12",
  "recent_statement": "Huang CES 2026 nuclear-dependency remarks.",
  "watch_events_raw": "Kairos first operating license (2027-28 target); Oklo Aurora deployment; NuScale VOYGR orders",
  "months_from_today": 62,
  "probability_layer": "Base-case",
  "active_start_month": "2031-01",
  "december_dispersal": {
    "reason": "december_dispersal: domain=Energy → 11/2032",
    "new_date": "2032-11-30",
    "old_date": "2032-12-31",
    "applied_at": "2026-04-30T16:28:34.304992+00:00"
  },
  "flag_nia_bracketed": false,
  "track_record_grade": "A",
  "track_record_notes": "Huang directional calls on AI infrastructure have been remarkably accurate.",
  "contradicting_notes": "NRC SMR-approval cycle historically slow; Kairos KP-FHR first operating license still 2027-2028; co-location zoning remains challenging.",
  "flag_near_term_2027": false,
  "flag_high_conviction": true,
  "milestones_phase2_at": "2026-05-01T21:26:03.378526+00:00",
  "milestones_derived_at": "2026-05-02T03:08:51.025651+00:00",
  "reference_class_match": {
    "top_n": [
      {
        "id": "energy_grid_rebuild_5y",
        "cosine": 0.6093