Scenario paths (Phase 5)
37 named scenario nodes across 10 capability dimensions. Each prediction linked to a primary scenario inherits its target_window_end; LBP propagates probability shifts. Mutually- exclusive dimensions are renormalized for display; toggle show raw.
Scenarios
37
Linked predictions
241
Dimensions
10
10 expected
Last LBP
2026-06-07
6h ago
AGI / General Capability
mutually exclusive · 4 scenarios · 80 linked predictions · sum_priors=1.00 · sum_current=1.00
S_AGI_FAST_20272027-09-3030.0%
AGI fast: drop-in remote worker by 2027-09
no probability history yet
26 linked predictions
S_AGI_MID_20292029-03-3135.0%
AGI mid: Kurzweil 2029 path
no probability history yet
53 linked predictions
S_AGI_SLOW_20312031-11-3025.0%
AGI slow: Schmidt/Hassabis 5-10 year path
no probability history yet
1 linked predictions
top 1 by probability
- 238_007There will be no more than ~10 foundation model la44%
S_AGI_WINTER_2036PLUS2036-12-31beyond horizon10.0%
AGI delayed: capability plateau or AI winter
no probability history yet
0 linked predictions
ASI / Recursive Self-Improvement
mutually exclusive · 3 scenarios · 29 linked predictions · sum_priors=1.00 · sum_current=1.00
S_ASI_FAST_20312031-12-3110.0%
ASI fast: RSI within 5y of AGI
no probability history yet
1 linked predictions
top 1 by probability
- 229_046Current Figure robots have 3-5x headroom in speed 28%
S_ASI_MID_20342034-06-30beyond horizon30.0%
ASI mid: Schmidt 'ASI in 6 years'
no probability history yet
4 linked predictions
S_ASI_SLOW_2040PLUS2040-12-31beyond horizon60.0%
ASI slow: post-2040 / soft takeoff
no probability history yet
24 linked predictions
Humanoid Deployment
cumulative milestones · 4 scenarios · 35 linked predictions · sum_priors=1.20 · sum_current=1.20
S_HUMANOID_FACTORY_20262026-11-3040.0%
Humanoid R1: 10K+ factory units by Nov 2026
no probability history yet
2 linked predictions
S_HUMANOID_ENTERPRISE_20282028-11-3050.0%
Humanoid R2: 100K+ enterprise by Nov 2028
no probability history yet
19 linked predictions
S_HUMANOID_CONSUMER_20302030-11-3020.0%
Humanoid R3: 1M+ consumer by Nov 2030
no probability history yet
14 linked predictions
S_HUMANOID_MASS_20332033-12-31beyond horizon10.0%
Humanoid R4: 10M+ cumulative by Dec 2033
no probability history yet
0 linked predictions
Robotaxi / Self-Driving
— · 4 scenarios · 44 linked predictions · sum_priors=1.35 · sum_current=1.35
S_ROBOTAXI_TESLA_20262026-11-3040.0%
Tesla FSD unsupervised wide deployment by Nov 2026
no probability history yet
4 linked predictions
S_ROBOTAXI_NATIONWIDE_20282028-11-3045.0%
Robotaxi nationwide expansion by Nov 2028
no probability history yet
6 linked predictions
S_ROBOTAXI_MASS_20302030-11-3030.0%
Robotaxi >10% urban miles by Nov 2030
no probability history yet
34 linked predictions
S_ROBOTAXI_DELAYED2032-12-31beyond horizon20.0%
Robotaxi mass deployment delayed past 2031
no probability history yet
0 linked predictions
Compute Scale (Stargate)
— · 4 scenarios · 1 linked predictions · sum_priors=1.35 · sum_current=1.35
S_COMPUTE_1GW_20272027-06-3060.0%
Compute: 1GW operational by Jun 2027
no probability history yet
0 linked predictions
S_COMPUTE_10GW_20282028-12-3140.0%
Compute: 10GW total by Dec 2028
no probability history yet
1 linked predictions
top 1 by probability
- 246_036Terafab will deliver 1 terawatt/year AI compute, 546%
S_COMPUTE_STARGATE_FAILURE2029-12-3115.0%
Stargate failure: <500MW by 2029
no probability history yet
0 linked predictions
S_COMPUTE_100GW_20302030-12-3120.0%
Compute: 100GW national-scale by Dec 2030
no probability history yet
0 linked predictions
Energy / Grid Expansion
— · 3 scenarios · 8 linked predictions · sum_priors=1.00 · sum_current=1.00
S_GRID_50GW_20272027-12-3140.0%
50GW dedicated AI/data center grid by Dec 2027
no probability history yet
1 linked predictions
top 1 by probability
- 240_017Optimization may eliminate need to tile the world 35%
S_GRID_50GW_20292029-12-3150.0%
50GW grid expansion by Dec 2029
no probability history yet
6 linked predictions
S_GRID_50GW_DELAYED2032-12-31beyond horizon10.0%
50GW grid expansion delayed past 2031
no probability history yet
1 linked predictions
top 1 by probability
- 238_048US must find 100 GW of new power or lose AI race t45%
AI Regulatory Pause
mutually exclusive · 4 scenarios · 0 linked predictions · sum_priors=1.00 · sum_current=1.00
S_AI_PAUSE_20262026-12-315.0%
Major-country AI pause beginning 2026
no probability history yet
0 linked predictions
S_AI_PAUSE_20272027-12-3110.0%
AI pause beginning 2027
no probability history yet
0 linked predictions
S_AI_PAUSE_20282028-12-3110.0%
AI pause beginning 2028
no probability history yet
0 linked predictions
S_NO_AI_PAUSE_5Y2031-12-3175.0%
No major AI pause through 2031
no probability history yet
0 linked predictions
$1T+ IPO Timeline
mutually exclusive · 4 scenarios · 17 linked predictions · sum_priors=1.00 · sum_current=1.00
S_IPO_TRILLION_20262026-11-3025.0%
First $1T+ IPO in 2026
no probability history yet
3 linked predictions
S_IPO_TRILLION_20272027-09-3040.0%
First $1T+ IPO in 2027
no probability history yet
1 linked predictions
top 1 by probability
- 236_008First $100 trillion dollar companies and multi-tri53%
S_IPO_TRILLION_20282028-09-3025.0%
First $1T+ IPO in 2028
no probability history yet
13 linked predictions
S_IPO_TRILLION_NONE_5Y2031-12-3110.0%
No $1T+ IPO through 2031
no probability history yet
0 linked predictions
Macro Recession
mutually exclusive · 4 scenarios · 16 linked predictions · sum_priors=1.00 · sum_current=1.00
S_RECESSION_20262026-12-3120.0%
NBER recession declared 2026
no probability history yet
5 linked predictions
S_RECESSION_20272027-12-3130.0%
NBER recession declared 2027
no probability history yet
5 linked predictions
S_RECESSION_20282028-12-3130.0%
NBER recession declared 2028
no probability history yet
6 linked predictions
S_NO_RECESSION_5Y2031-12-3120.0%
No NBER recession through 2031
no probability history yet
0 linked predictions
Mars Uncrewed Landing
mutually exclusive · 3 scenarios · 11 linked predictions · sum_priors=1.00 · sum_current=1.00
S_MARS_20262026-11-3025.0%
Mars uncrewed: 2026 transfer window
no probability history yet
4 linked predictions
S_MARS_20282028-12-3150.0%
Mars uncrewed: 2028 transfer window (most likely first attempt)
no probability history yet
7 linked predictions
S_MARS_2031PLUS2031-01-3125.0%
Mars uncrewed: 2031+ transfer window or further delay
no probability history yet
0 linked predictions
Methodology
Scenario node: kind='scenario', target_window_end = archetypal resolution date,
current_prob evolves via Phase 4 stack (Bayesian + blend + LBP)
Prediction → Scenario assignment: edge kind='prereq', src=scenario, dst=prediction
(scenario enables prediction's resolution at its date)
Mutually-exclusive dimensions (sum of priors must = 1.0):
agi_general_capability, asi_recursive_self_improvement,
mars_uncrewed_landing, macro_recession, ipo_trillion_plus,
ai_regulatory_pause
Cumulative dimensions (priors are independent milestones, may sum > 1.0):
humanoid_deployment, robotaxi_deployment, compute_scale,
energy_grid_expansion
Default view renormalizes exclusive dimensions to display Σ=1.0 across
their scenarios. Use ?normalize=raw to see the underlying current_prob values.
When ANY scenario's probability shifts (via intake, milestone miss, LBP, or
manual update), all predictions linked via prereq edge inherit a downstream
probability change in the next LBP run.