COD_AI_002predictionAI/Computegigawatt-cluster
At least one 1 GW Vera Rubin frontier-training cluster reaches deployment by Q1 2027
Predictor: Codex Research Pack
Prior probability
52.0%
Current probability
39.7%
evolves via intake + LBP
Conviction
3/5
Signal quality
—
Resolution
pending
Window
2026-10-01 – 2027-03-31
Edges in / out
2 / 0
Tickers exposed
6
Prediction text
At least one 1 GW Vera Rubin frontier-training cluster reaches deployment by Q1 2027
Predictor: Codex Research Pack
κ + Brier as of 2026-05-22
κ (discount)
0.850
Brier
—
Hits / Misses
0 / 0
Hit rate
—
Evidence about this node from Codex Research Pack is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class
Not linked
This node isn't linked to a reference class. The Bayesian update applies without outside-view blending.
Probability over time
3 prob_history rows
intake v2milestone miss sweeplbp propagationreference class assignedlegacy v1prior_prob (analyst seed)current = 39.7%
Milestone chain
Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.
Leading chain: 6 pending
- 2026-07-01 → 2026-12-31pendingVera Rubin Superchip generally availableHow: NVIDIA confirms Vera Rubin Superchip 2H-2026 GA per CES 2026 announcement; OEMs (SMCI, Dell, HPE) ship Rubin-based systems to first customersSource: deep_research_enrichedconf 85%
- 2026-11-01pendingQ1 window check-in (25%)
- 2026-12-02pendingQ2 window check-in (50%)
- 2026-09-01 → 2027-03-31pendingNVIDIA Manassas GW research center reaches first-lightHow: NVIDIA announces operational status of Manassas Vera Rubin NVL72 reference factory at 100MW+ capacitySource: deep_research_enrichedconf 70%
- 2026-12-31pendingFirst named hyperscaler announces 1 GW Rubin cluster contractHow: Microsoft / Google / Meta / Oracle / Amazon publicly commits to single-site Vera Rubin deployment >=1 GW capacity (the $12B early-2027 deployment qualifies)Source: deep_research_enrichedconf 85%
- 2027-01-02pendingQ3 window check-in (75%)
- 2027-01-01 → 2027-03-31pendingFirst 1 GW Rubin cluster powered on / training run beginsHow: Hyperscaler or partner discloses energization of named site at 1 GW or above with Rubin GPUs running production training workloadSource: deep_research_enrichedconf 60%
- 2027-07-01 → 2027-12-31pendingRubin Ultra ships in 2H 2027 (cascade event indicating GW-scale market maturation)How: NVIDIA ships Rubin Ultra as documented at GTC 2026 roadmap; Kyber rack with 576 GPU configuration reaches general availabilitySource: deep_research_enrichedconf 70%
What if this resolves?
Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 40%)
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Every probability update with full Bayesian provenance — chronological, latest first
LBP2026-05-17T02:00:01Z39.7%-1.7pp
Network propagation: 41.5% → 39.7%
5-iter LBP, residual 0.00689 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run e607fa96
LBP2026-05-10T02:00:02Z41.5%-3.5pp
Network propagation: 45.0% → 41.5%
6-iter LBP, residual 0.00584 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run e5c18d29
LBP2026-05-03T02:00:01Z45.0%-7.0pp
Network propagation: 52.0% → 45.0%
6-iter LBP, residual 0.00677 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run 1a683ac9
Network propagation neighbors
Top edges sorted by latest LBP cross-impact
Top incoming (parents)
Edges that influence THIS node's belief
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | S_COMPUTE_1GW_2027 Compute: 1GW operational by Jun 2027 | 60.0% | 0.520 | 0.050 | -0.065 |
Top outgoing (children)
Predictions THIS node influences
No outgoing edges.
Ticker exposure
6 ticker(s) linked
Beneficiaries (6)
Prerequisites (2)
Predictions that must hit first
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | S_COMPUTE_1GW_2027 | Compute: 1GW operational by Jun 2027 | compute_scale | — |
| correlate | S_COMPUTE_10GW_2028 | Compute: 10GW total by Dec 2028 | compute_scale | — |
Dependents (0)
Predictions enabled by this
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| No dependents | ||||
Expected milestones (1)
From Sheet 17 Monitoring Triggers
| Expected by | Description | Status |
|---|---|---|
| 2027-03-31 | Thinking Machines/NVIDIA 1 GW Vera Rubin deployment target early 2027 | pending |
Linked documents (10)
Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
| Sim | Source | Title | Market prob | Polarity | Reviewed | Published |
|---|---|---|---|---|---|---|
| 0.700 | codex_research_pack | NVIDIA - Vera Rubin Opens Agentic AI Frontier | — | mentions | pending | 2026-03-16 |
| 0.568 | edgar_8k | Palo Alto Networks Inc (PANW) (CIK 0001327567) | — | mentions | pending | 2026-06-02 |
| 0.559 | edgar_8k | VERACYTE, INC. (VCYT) (CIK 0001384101) | — | mentions | pending | 2026-05-05 |
| 0.553 | edgar_8k | Voyager Technologies, Inc./DE (VOYG) (CIK 0001788060) | — | mentions | pending | 2026-06-04 |
| 0.553 | edgar_8k | Voyager Technologies, Inc./DE (VOYG) (CIK 0001788060) | — | mentions | pending | 2026-05-04 |
| 0.553 | edgar_8k | Voyager Technologies, Inc./DE (VOYG) (CIK 0001788060) | — | mentions | pending | 2026-06-01 |
| 0.550 | edgar_8k | CISCO SYSTEMS, INC. (CSCO) (CIK 0000858877) | — | mentions | pending | 2026-05-13 |
| 0.542 | edgar_8k | WESTERN DIGITAL CORP (WDC) (CIK 0000106040) | — | mentions | pending | 2026-06-03 |
| 0.541 | edgar_8k | Veralto Corp (VLTO) (CIK 0001967680) | — | mentions | pending | 2026-06-01 |
| 0.541 | edgar_8k | Veralto Corp (VLTO) (CIK 0001967680) | — | mentions | pending | 2026-05-14 |
Raw metadata
From Thesis_Timeline_v1.0_FINAL workbook
{
"pack_id": "codex_research_event_pack_2026_04_30",
"milestones": [
{
"kind": "llm_pre_event",
"label": "Vera Rubin Superchip generally available",
"source": "deep_research_enriched",
"status": "pending",
"weight": 0.4,
"ordinal": -6,
"source_id": null,
"confidence": 0.85,
"source_url": "https://nvidianews.nvidia.com/news/rubin-platform-ai-supercomputer",
"expected_date": "2026-09-30",
"research_origin": "deep_research",
"expected_date_range": {
"to": "2026-12-31",
"from": "2026-07-01"
},
"measurement_criterion": "NVIDIA confirms Vera Rubin Superchip 2H-2026 GA per CES 2026 announcement; OEMs (SMCI, Dell, HPE) ship Rubin-based systems to first customers"
},
{
"kind": "quartile_checkpoint",
"label": "Q1 window check-in (25%)",
"status": "pending",
"weight": 0.05,
"ordinal": -5,
"source_id": null,
"expected_date": "2026-11-01",
"observed_date": null
},
{
"kind": "quartile_checkpoint",
"label": "Q2 window check-in (50%)",
"status": "pending",
"weight": 0.05,
"ordinal": -4,
"source_id": null,
"expected_date": "2026-12-02",
"observed_date": null
},
{
"kind": "llm_pre_event",
"label": "NVIDIA Manassas GW research center reaches first-light",
"source": "deep_research_enriched",
"status": "pending",
"weight": 0.4,
"ordinal": -3,
"source_id": null,
"confidence": 0.7,
"source_url": "https://blogs.nvidia.com/blog/gigawatt-ai-factories-ocp-vera-rubin/",
"expected_date": "2026-12-15",
"research_origin": "deep_research",
"expected_date_range": {
"to": "2027-03-31",
"from": "2026-09-01"
},
"measurement_criterion": "NVIDIA announces operational status of Manassas Vera Rubin NVL72 reference factory at 100MW+ capacity"
},
{
"kind": "llm_pre_event",
"label": "First named hyperscaler announces 1 GW Rubin cluster contract",
"source": "deep_research_enriched",
"status": "pending",
"weight": 0.4,
"ordinal": -2,
"source_id": null,
"confidence": 0.85,
"source_url": "https://www.datacenterknowledge.com/data-center-chips/gtc-2026-nvidia-unveils-vera-rubin-ai-platform-eyes-1t-by-2027",
"expected_date": "2026-12-31",
"research_origin": "deep_research",
"measurement_criterion": "Microsoft / Google / Meta / Oracle / Amazon publicly commits to single-site Vera Rubin deployment >=1 GW capacity (the $12B early-2027 deployment qualifies)"
},
{
"kind": "quartile_checkpoint",
"label": "Q3 window check-in (75%)",
"status": "pending",
"weight": 0.05,
"ordinal": -1,
"source_id": null,
"expected_date": "2027-01-02",
"observed_date": null
},
{
"kind": "event",
"label": "At least one 1 GW Vera Rubin frontier-training cluster reaches deployment by Q1 2027",
"status": "pending",
"weight": 1,
"ordinal": 0,
"source_id": "COD_AI_002",
"expected_date": "2027-02-02",
"observed_date": null
},
{
"kind": "llm_pre_event",
"label": "First 1 GW Rubin cluster powered on / training run begins",
"source": "deep_research_enriched",
"status": "pending",
"weight": 0.4,
"ordinal": 1,
"source_id": null,
"confidence": 0.6,
"source_url": "https://www.datacenterknowledge.com/data-center-chips/gtc-2026-nvidia-unveils-vera-rubin-ai-platform-eyes-1t-by-2027",
"expected_date": "2027-02-14",
"research_origin": "deep_research",
"expected_date_range": {
"to": "2027-03-31",
"from": "2027-01-01"
},
"measurement_criterion": "Hyperscaler or partner discloses energization of named site at 1 GW or above with Rubin GPUs running production training workload"
},
{
"kind": "llm_
... (truncated)