COD_SPC_002predictionSpaceArtemis-lunar-landing
The next US crewed lunar surface landing occurs on Artemis IV in 2028
Predictor: Codex Research Pack
Prior probability
45.0%
Current probability
22.2%
evolves via intake + LBP
Conviction
3/5
Signal quality
—
Resolution
pending
Window
2028-01-01 – 2028-12-31
Edges in / out
4 / 0
Tickers exposed
4
Prediction text
The next US crewed lunar surface landing occurs on Artemis IV in 2028
Predictor: Codex Research Pack
κ + Brier as of 2026-05-22
κ (discount)
0.850
Brier
—
Hits / Misses
0 / 0
Hit rate
—
Evidence about this node from Codex Research Pack is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class
Not linked
This node isn't linked to a reference class. The Bayesian update applies without outside-view blending.
Probability over time
3 prob_history rows
intake v2milestone miss sweeplbp propagationreference class assignedlegacy v1prior_prob (analyst seed)current = 22.2%
Milestone chain
Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.
Leading chain: 1 overdue ⏱ · 8 pending
- 2026-04-30overdueArtemis II crewed lunar flyby completesHow: NASA confirms successful Artemis II free-return lunar flyby; Orion crew returns and splashdown verified per NASA press conferenceSource: Artemis program status pagesconf 85%
- 2027-06-30pendingArtemis IV crew assigned and named publiclyHow: NASA press conference names commander, pilot, mission specialists for Artemis IV (typically ~12-18 months before launch)Source: Pattern from Artemis II crew announcement timingconf 70%
- 2027-01-01 → 2027-12-31pendingSpaceX Starship HLS uncrewed lunar demo lands successfullyHow: SpaceX or NASA press release confirms uncrewed Starship HLS makes a soft landing on lunar surface and powers up; required gate before Artemis IV crewed attemptSource: Artemis program timeline + SLS Block 1B pageconf 50%
- 2027-09-30pendingSLS Block 1B with Exploration Upper Stage completes Green RunHow: NASA Stennis/Marshall confirms Exploration Upper Stage hot-fire complete; SLS Block 1B integrated for Artemis IV per NASA SLS program updateSource: NASA SLS Block 1B referenceconf 55%
- 2028-02-16pendingQ1 window check-in (25%)
- 2028-04-02pendingQ2 window check-in (50%)
- 2028-04-30pendingNASA confirms Artemis IV launch date within 90 days of T-0How: NASA Flight Readiness Review press conference sets Artemis IV launch date within 2028 calendar windowSource: GAO-25-106943 NASA Artemis missions oversightconf 45%
- 2028-05-18pendingQ3 window check-in (75%)
No downstream cascades — this prediction is a leaf in the dependency graph.
What if this resolves?
Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 22%)
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Every probability update with full Bayesian provenance — chronological, latest first
LBP2026-05-10T02:00:02Z22.2%-2.0pp
Network propagation: 24.2% → 22.2%
6-iter LBP, residual 0.00584 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run e5c18d29
metadata_milestone_miss_sweep2026-05-08T22:15:34Z24.2%-6.1pp
metadata_milestone_miss_sweep bayesian_v2 n=1 inside=0.242 blend=0.242 LLR=-0.310 κ=0.90 no_blend
Raw metadata
{
"trf": 1,
"kappa": 0.9,
"base_rate": null,
"predictor": "Codex Research Pack",
"total_llr": -0.4054651081081644,
"grace_days": 7,
"bayesian_v2": true,
"prior_logit": -0.8330426134812354,
"bayes_factor": "1.4:1 against",
"blend_reason": "no reference_class linked",
"inside_prior": 0.3030021101760346,
"kappa_source": "predictor_table",
"n_milestones": 1,
"blend_applied": false,
"contributions": [
{
"llr": -0.4054651081081644,
"kind": "llm_pre_event",
"kappa": 0.765,
"label": "Artemis II crewed lunar flyby completes",
"weight": 0.4,
"strength": "weak",
"confidence": 0.85,
"source_url": "https://en.wikipedia.org/wiki/Artemis_II",
"adjusted_llr": -0.31018080770274575,
"expected_date": "2026-04-30",
"measurement_criterion": "NASA confirms successful Artemis II free-return lunar flyby; Orion crew returns and splashdown verified per NASA press conference"
}
],
"evidence_kind": "metadata_milestone_miss_sweep",
"inside_source": "history_v2",
"inside_weight": 0.3,
"outside_weight": 0.7,
"posterior_prob": 0.24172902866563648,
"posterior_logit": -1.1432234211839811,
"predictor_brier": null,
"inside_posterior": 0.24172902866563648,
"blended_posterior": 0.24172902866563648,
"reference_class_id": null,
"total_adjusted_llr": -0.31018080770274575,
"predictor_n_resolved": 0
}LBP2026-05-03T02:00:01Z30.3%-14.7pp
Network propagation: 45.0% → 30.3%
6-iter LBP, residual 0.00677 · damping 0.5, w_intrinsic 0.5 · method lbp_v3 · run 1a683ac9
Network propagation neighbors
Top edges sorted by latest LBP cross-impact
Top incoming (parents)
Edges that influence THIS node's belief
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | COD_SPC_003 SpaceX completes large-scale Starship vehicle-to-vehicle cry — Codex Research Pack | 41.6% | 0.450 | 0.050 | -0.003 |
Top outgoing (children)
Predictions THIS node influences
No outgoing edges.
Ticker exposure
4 ticker(s) linked
Beneficiaries (4)
Prerequisites (4)
Predictions that must hit first
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | COD_SPC_003 | SpaceX completes large-scale Starship vehicle-to-vehicle cryogenic propellant transfer by end 2026 | Space | — |
| correlate | S_MARS_2028 | Mars uncrewed: 2028 transfer window (most likely first attempt) | mars_uncrewed_landing | — |
| correlate | S_MARS_2031PLUS | Mars uncrewed: 2031+ transfer window or further delay | mars_uncrewed_landing | — |
| correlate | S_MARS_2026 | Mars uncrewed: 2026 transfer window | mars_uncrewed_landing | — |
Dependents (0)
Predictions enabled by this
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| No dependents | ||||
Expected milestones (1)
From Sheet 17 Monitoring Triggers
| Expected by | Description | Status |
|---|---|---|
| 2028-12-31 | NASA Artemis IV astronaut lunar surface return target | pending |
Linked documents (10)
Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
Raw metadata
From Thesis_Timeline_v1.0_FINAL workbook
{
"pack_id": "codex_research_event_pack_2026_04_30",
"milestones": [
{
"kind": "llm_pre_event",
"label": "Artemis II crewed lunar flyby completes",
"source": "Artemis program status pages",
"status": "overdue",
"weight": 0.4,
"ordinal": -9,
"source_id": null,
"confidence": 0.85,
"source_url": "https://en.wikipedia.org/wiki/Artemis_II",
"expected_date": "2026-04-30",
"miss_emitted_at": "2026-05-08T22:15:34.476563+00:00",
"miss_emitted_by": "metadata_milestone_sweep",
"research_origin": "deep_research",
"measurement_criterion": "NASA confirms successful Artemis II free-return lunar flyby; Orion crew returns and splashdown verified per NASA press conference"
},
{
"kind": "prereq",
"label": "SpaceX completes large-scale Starship vehicle-to-vehicle cryogenic propellant transfer by end 2026",
"status": "pending",
"weight": 0.8,
"ordinal": -8,
"source_id": "COD_SPC_003",
"expected_date": "2026-11-06",
"observed_date": null
},
{
"kind": "llm_pre_event",
"label": "Artemis IV crew assigned and named publicly",
"source": "Pattern from Artemis II crew announcement timing",
"status": "pending",
"weight": 0.4,
"ordinal": -7,
"source_id": null,
"confidence": 0.7,
"source_url": "https://en.wikipedia.org/wiki/Artemis_IV",
"expected_date": "2027-06-30",
"research_origin": "deep_research",
"measurement_criterion": "NASA press conference names commander, pilot, mission specialists for Artemis IV (typically ~12-18 months before launch)"
},
{
"kind": "llm_pre_event",
"label": "SpaceX Starship HLS uncrewed lunar demo lands successfully",
"source": "Artemis program timeline + SLS Block 1B page",
"status": "pending",
"weight": 0.4,
"ordinal": -6,
"source_id": null,
"confidence": 0.5,
"source_url": "https://www.nasa.gov/reference/sls-space-launch-system-block-1b/",
"expected_date": "2027-07-02",
"research_origin": "deep_research",
"expected_date_range": {
"to": "2027-12-31",
"from": "2027-01-01"
},
"measurement_criterion": "SpaceX or NASA press release confirms uncrewed Starship HLS makes a soft landing on lunar surface and powers up; required gate before Artemis IV crewed attempt"
},
{
"kind": "llm_pre_event",
"label": "SLS Block 1B with Exploration Upper Stage completes Green Run",
"source": "NASA SLS Block 1B reference",
"status": "pending",
"weight": 0.4,
"ordinal": -5,
"source_id": null,
"confidence": 0.55,
"source_url": "https://www.nasa.gov/reference/sls-space-launch-system-block-1b/",
"expected_date": "2027-09-30",
"research_origin": "deep_research",
"measurement_criterion": "NASA Stennis/Marshall confirms Exploration Upper Stage hot-fire complete; SLS Block 1B integrated for Artemis IV per NASA SLS program update"
},
{
"kind": "quartile_checkpoint",
"label": "Q1 window check-in (25%)",
"status": "pending",
"weight": 0.05,
"ordinal": -4,
"source_id": null,
"expected_date": "2028-02-16",
"observed_date": null
},
{
"kind": "quartile_checkpoint",
"label": "Q2 window check-in (50%)",
"status": "pending",
"weight": 0.05,
"ordinal": -3,
"source_id": null,
"expected_date": "2028-04-02",
"observed_date": null
},
{
"kind": "llm_pre_event",
"label": "NASA confirms Artemis IV launch date within 90 days of T-0",
"source": "GAO-25-106943 NASA Artemis missions oversight",
"status": "pending",
"weight": 0.4,
"ordinal": -2,
"source_id": null,
"confidence": 0.45,
"source_url": "https://www.gao.gov/assets/gao-25-106943-highlights.pdf",
"expected_date": "2028-04-30",
"rese
... (truncated)