92 GW power shortage in America between now and 2030
Predictor: Eric Schmidt · ep#241 "Eric Schmidt on the Robotics Race, Singularity Timeline, and Energy Shortage" · source
Prediction text
92 GW power shortage in America between now and 2030 | there was an estimated 92 gigawatts shortage of power in America in the next between now and 2030
Verbatim quote
there was an estimated 92 gigawatts shortage of power in America in the next between now and 2030
Predictor: Eric Schmidt
Calibration plot (stated vs observed)
Evidence about this node from Eric Schmidt is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class: energy_grid_rebuild_5y
Major grid expansion (>50GW) within 5y of announce
Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.
Probability over time
Milestone chain
- 2026-03-15hitEric Schmidt cites 92GW shortage figure publiclyHow: Eric Schmidt or US grid policy official publicly cites a ~92GW US power shortage estimate for the 2025-2030 horizonSource: https://www.diamandis.com/podcast/eric-schmidt-singularitys-arrivalconf 99%Notes: HIT — Schmidt cited 92GW figure on Moonshots #241 podcast.
- 2026-04-01hitS&P Global confirms 22% data-center grid demand rise in 2025-2026How: S&P Global reports 22%+ year-over-year increase in US data center grid power demandSource: https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/101425-data-center-grid-power-demand-to-rise-22-in-2025-nearly-triple-by-2030conf 99%
- 2026-06-30pendingPJM declares 2027 reliability shortfall of 6GWHow: PJM Interconnection publishes formal capacity shortfall projection >=6GW for 2027 in resource adequacy reportSource: https://interestingengineering.com/energy/ai-power-grid-data-centers-usconf 90%
- 2026-07-01 → 2027-06-30pendingFederal grid emergency authority invoked for AI data centersHow: DOE invokes Federal Power Act §202(c) emergency authority or executive order on grid capacity citing AI demandSource: Federal Register; DOE pressconf 40%
- 2026-12-31pendingUS data center demand reaches 75GW in 2026 per S&PHow: S&P Global confirms 2026 US data center demand of 75GW+ (on path to 134GW by 2030)Source: https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/101425-data-center-grid-power-demand-to-rise-22-in-2025-nearly-triple-by-2030conf 70%
What if this resolves?
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Network propagation neighbors
Top incoming (parents)
Edges that influence THIS node's belief
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | SEM_042 2025 will be the definitive year that agentic systems finall — Kevin Weil | 73.8% | 0.600 | 0.050 | -0.057 |
| prereq | SEM_012 Nvidia quadrupled chip production output while only doubling — Jensen Huang | 75.0% | 0.600 | 0.050 | -0.049 |
| prereq | SEM_008 Training runs costing $10 billion for a single model will co — Dario Amodei | 76.9% | 0.600 | 0.050 | -0.039 |
| killer | TK03 AI Regulatory Moratorium (EU/US Capability Freeze) | 10.0% | 0.050 | 0.600 | +0.037 |
| prereq | 238_009 Recursive self-improvement is already happening now (no long — Alex Wissner-Gross | 78.1% | 0.600 | 0.050 | -0.033 |
Top outgoing (children)
Predictions THIS node influences
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | 232_055 We're exiting the industrial age permanently as recursive se — Peter Diamandis | 35.5% | 0.700 | 0.050 | +0.022 |
| prereq | 231_013 Math is cooked (will be solved), physics cooked, biology cha — Alex Wissner-Gross | 35.4% | 0.620 | 0.050 | -0.018 |
| prereq | CMQ_002 By 2028, AI systems will reach 'independent researcher' leve — Sam Altman | 31.4% | 0.550 | 0.050 | -0.013 |
| prereq | 235_030 Ray Kurzweil predicts Longevity Escape Velocity (LEV) by 203 — Ray Kurzweil | 39.2% | 0.750 | 0.050 | +0.009 |
| prereq | 241_043 ASI will arrive within 2 years to 5 years to this next decad — Peter Diamandis | 35.9% | 0.650 | 0.050 | -0.007 |
Ticker exposure
Beneficiaries (23)
Adverse (6)
Prerequisites (11)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | SEM_008 | Training runs costing $10 billion for a single model will commence sometime in 2025. | AI | — |
| prereq | 238_009 | Recursive self-improvement is already happening now (no longer three years out) | AI | — |
| prereq | SEM_012 | Nvidia quadrupled chip production output while only doubling human headcount — achieved by deploying AI coding tools (Cursor, Claude Code) across engineering. | AI/Manufacturing | — |
| prereq | SEM_042 | 2025 will be the definitive year that agentic systems finally hit the mainstream. | AI/Agents | — |
| correlate | S_COMPUTE_10GW_2028 | Compute: 10GW total by Dec 2028 | compute_scale | — |
| correlate | S_GRID_50GW_2027 | 50GW dedicated AI/data center grid by Dec 2027 | energy_grid_expansion | — |
| correlate | S_COMPUTE_STARGATE_FAILURE | Stargate failure: <500MW by 2029 | compute_scale | — |
| correlate | S_GRID_50GW_DELAYED | 50GW grid expansion delayed past 2031 | energy_grid_expansion | — |
| killer | TK14 | Superbubble Pop (S&P 500 -40%, Moonshot Capital Evaporates) | — | — |
| killer | TK01 | AGI Capability Plateau (2026-27 Training Stall) | — | — |
| killer | TK03 | AI Regulatory Moratorium (EU/US Capability Freeze) | — | — |
Dependents (5)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | 235_030 | Ray Kurzweil predicts Longevity Escape Velocity (LEV) by 2033. | Biotech/Longevity | — |
| prereq | 232_055 | We're exiting the industrial age permanently as recursive self-improvement unfolds. | AI | — |
| prereq | 241_043 | ASI will arrive within 2 years to 5 years to this next decade | AI | — |
| prereq | 231_013 | Math is cooked (will be solved), physics cooked, biology char broiled. | AI | — |
| prereq | CMQ_002 | By 2028, AI systems will reach 'independent researcher' level — driving autonomous scientific discoveries without human intervention. | AI | — |
Linked documents (2)
| Sim | Source | Title | Market prob | Polarity | Reviewed | Published |
|---|---|---|---|---|---|---|
| 0.546 | edgar_8k | PLUG POWER INC (PLUG) (CIK 0001093691) | — | mentions | pending | 2026-05-11 |
| 0.546 | edgar_8k | PLUG POWER INC (PLUG) (CIK 0001093691) | — | mentions | pending | 2026-06-04 |
Raw metadata
{
"nia": false,
"qty": "92 GW shortage",
"url": "https://www.youtube.com/watch?v=DpwmmXmzvfo",
"mode": "FORECAST",
"role": "Guest-CEO",
"caveats": "estimate",
"context": "estimated 92 gigawatts shortage of power in America in the next between now and 2030",
"to_year": 2030,
"verbatim": "there was an estimated 92 gigawatts shortage of power in America in the next between now and 2030",
"conv_cues": "estimated",
"direction": "NUMERIC_TARGET",
"from_year": 2026,
"timeframe": "by 2030",
"conv_level": "HIGH",
"milestones": [
{
"kind": "llm_pre_event",
"label": "Eric Schmidt cites 92GW shortage figure publicly",
"notes": "HIT — Schmidt cited 92GW figure on Moonshots #241 podcast.",
"source": "https://www.diamandis.com/podcast/eric-schmidt-singularitys-arrival",
"status": "hit",
"weight": 0.4,
"ordinal": -7,
"source_id": null,
"confidence": 0.99,
"source_url": "https://www.diamandis.com/podcast/eric-schmidt-singularitys-arrival",
"expected_date": "2026-03-15",
"observed_date": "2026-03-15",
"research_origin": "deep_research",
"measurement_criterion": "Eric Schmidt or US grid policy official publicly cites a ~92GW US power shortage estimate for the 2025-2030 horizon"
},
{
"kind": "llm_pre_event",
"label": "S&P Global confirms 22% data-center grid demand rise in 2025-2026",
"source": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/101425-data-center-grid-power-demand-to-rise-22-in-2025-nearly-triple-by-2030",
"status": "hit",
"weight": 0.4,
"ordinal": -6,
"source_id": null,
"confidence": 0.99,
"source_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/101425-data-center-grid-power-demand-to-rise-22-in-2025-nearly-triple-by-2030",
"expected_date": "2026-04-01",
"observed_date": "2026-04-01",
"research_origin": "deep_research",
"measurement_criterion": "S&P Global reports 22%+ year-over-year increase in US data center grid power demand"
},
{
"kind": "prereq",
"label": "Nvidia quadrupled chip production output while only doubling human headcount — achieved by deploying AI coding tools (Cursor, Claude Code) a",
"status": "hit",
"weight": 0.5,
"ordinal": -5,
"source_id": "SEM_012",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29"
},
{
"kind": "prereq",
"label": "Training runs costing $10 billion for a single model will commence sometime in 2025.",
"status": "hit",
"weight": 0.5,
"ordinal": -4,
"source_id": "SEM_008",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29"
},
{
"kind": "prereq",
"label": "2025 will be the definitive year that agentic systems finally hit the mainstream.",
"status": "hit",
"weight": 0.5,
"ordinal": -3,
"source_id": "SEM_042",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29"
},
{
"kind": "prereq",
"label": "Recursive self-improvement is already happening now (no longer three years out)",
"status": "hit",
"weight": 0.5,
"ordinal": -2,
"source_id": "238_009",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29"
},
{
"kind": "llm_pre_event",
"label": "PJM declares 2027 reliability shortfall of 6GW",
"source": "https://interestingengineering.com/energy/ai-power-grid-data-centers-us",
"status": "pending",
"weight": 0.4,
"ordinal": -1,
"source_id": null,
"confidence": 0.9,
"source_url": "https://interestingengineering.com/energy/ai-power-grid-data-centers-us",
"expected_date": "2026-06-30",
"research_origin": "deep_research",
"measurement_criterion": "PJM Interconnection publishes formal capacity shortfall projection >=6GW
... (truncated)