S_GRID_50GW_2029scenarioenergy_grid_expansion

50GW grid expansion by Dec 2029

Prior probability
50.0%
Current probability
50.0%
evolves via intake + LBP
Conviction
Signal quality
Resolution
pending
Window
2026-04-30 – 2029-12-31
Edges in / out
0 / 15
Tickers exposed
0

Prediction text

Most likely realistic timeline given construction/permitting.

Predictor calibration

Not assigned

This node has no predictor assigned. Default κ=0.5 applies to any intake evidence about it.

Reference class: energy_grid_rebuild_5y

Linked

Major grid expansion (>50GW) within 5y of announce

Base rate
50.0%
3/6 historical
Inside weight
Outside weight
no pull

Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.

Probability over time

0 prob_history rows
No probability history yet.

Milestone chain

Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.

No milestone chain derived yet. Run scripts/ops/derive_milestones.py to populate from prereq edges + window checkpoints.

What if this resolves?

Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 50%)

Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"

Evidence chain

Every probability update with full Bayesian provenance — chronological, latest first

No probability history yet. The first evidence will arrive via /api/intake or the daily milestone sweep / weekly LBP run.

Network propagation neighbors

Top edges sorted by latest LBP cross-impact
All propagation →

Top incoming (parents)

Edges that influence THIS node's belief

No incoming edges.

Top outgoing (children)

Predictions THIS node influences

KindNodeTheir probP(c|s=T)P(c|s=F)Δ implied
prereq247_049
Solar PV capped materially less than 100% efficiency by physAlex Wissner-Gross
44.7%0.5500.050-0.147
prereq238_046
xAI will build every new data center at 1.2 gigawatts scaleGwynne Shotwell / xAI
44.1%0.5500.050-0.141
prereq238_066
Pete Donovan aspires to build 20,000 distributed 10MW data cPete (audience, data center builder)
40.7%0.5000.050-0.132
prereq238_067
US power problem is transmission/storage, not production — dDave Blundin
41.2%0.5500.050-0.112
prereq246_018
Killer app of compact fusion reactors will be interplanetaryAlex Wissner-Gross
36.0%0.4500.050-0.110

Prerequisites (0)

Predictions that must hit first
TypePredTitleDomainLag
No prerequisites

Dependents (15)

Predictions enabled by this
TypePredTitleDomainLag
prereq242_008Dyson sphere will come before any fusion reactor is licensedEnergy
prereq238_067US power problem is transmission/storage, not production — distributed regional data centers will fix job dislocationEnergy
prereq247_049Solar PV capped materially less than 100% efficiency by physicsEnergy
prereq238_046xAI will build every new data center at 1.2 gigawatts scaleEnergy
prereq238_066Pete Donovan aspires to build 20,000 distributed 10MW data centers across US high-school-football townsEnergy
prereq246_018Killer app of compact fusion reactors will be interplanetary/interstellar propulsion, not data centers.Energy
correlateINF_046Governments worldwide will increasingly prioritize absolute energy independence, pursuing self-sufficiency in critical materials and domestic manufacturing capacity to support Sovereign AI initiatives — extending beyond G7 to mid-sized nations (Estonia...Geopolitics
correlate235_022US will add a record 86 gigawatts of utility-scale capacity this coming year.Energy
correlate241_044Rate of data center construction will continue accelerating with government supportEnergy
correlate241_059Government will continue unleashing capital to solve AI power problemsEnergy
correlateFUT_018Rise of 'Energy Islanding' 2026-2031 — sovereign nations possessing BOTH geographic solar irradiance for massive arrays AND secure domestic raw materials (copper, lithium, cobalt, rare earths) for battery storage achieve unparalleled industrial autonom...Energy
correlate247_048Battery energy densities improving 8% year-over-year per constant dollarEnergy
correlate238_047US will add 86 GW of new grid capacity in 2026, 51% from solarEnergy
correlateINF_055Helion Energy will deliver the world's first commercial fusion electricity — the 50 MW Orion plant in Malaga, Washington — to Microsoft by 2028 under the industry's first fusion power-purchase agreement.Energy
correlateINF_057Helion will scale to 50 gigawatts of fusion-generated power to OpenAI by 2035 — equivalent to more than 7x Grand Coulee Dam output and roughly 1,000 Helion 50-MW reactors.Energy

Linked documents (2)

Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
SimSourceTitleMarket probPolarityReviewedPublished
0.574manifoldClaude Opus 4.8 METR 50% time horizonmentionspending2026-05-30
0.574manifoldClaude Opus 4.8 METR 50% time horizonmentionspending2026-05-30

Raw metadata

From Thesis_Timeline_v1.0_FINAL workbook
{
  "fork_key": "grid",
  "dimension": "energy_grid_expansion",
  "family_type": "cumulative",
  "family_label": "Energy / grid",
  "family_order": 2
}