Cost of chip shortage will be sole gating factor delaying illegal-human-driving tipping point
Predictor: Dave Blundin · ep#242 "Elon Enters the Chip Race, the S&P 500 Repricing, and Human Drivers Will Become Illegal | EP #242" · source
Prediction text
Cost of chip shortage will be sole gating factor delaying illegal-human-driving tipping point | the thing that would make it later is purely the shortage of chips. Like the technology will be there and the demand will be there long before the chips are there
Verbatim quote
the thing that would make it later is purely the shortage of chips. Like the technology will be there and the demand will be there long before the chips are there
Predictor: Dave Blundin
Calibration plot (stated vs observed)
Evidence about this node from Dave Blundin is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class
This node isn't linked to a reference class. The Bayesian update applies without outside-view blending.
Probability over time
Milestone chain
- 2026-04-30hitTSMC CEO confirms AI chip shortages persist beyond 2027How: TSMC executive (CEO C.C. Wei or equivalent) publicly states advanced-node shortages will persist beyond 2027Source: https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.htmlconf 95%
- 2026-04-30hitNVIDIA locks >50% of TSMC advanced capacity through 2027How: Trade press/analyst reporting confirms NVIDIA controls >50% of TSMC advanced-node capacity through 2026-2027Source: https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.htmlconf 90%
- 2026-10-29pendingQ1 window check-in (25%)
- 2026-12-31 → 2027-03-31pending600K vehicles lost in 2026 due to chip scarcity (UBS forecast)How: Annual vehicle production figures show >=500K vehicle shortfall vs prior plan attributable to AI/auto-chip shortageSource: https://enkiai.com/ai-market-intelligence/semiconductor-scarcity-2026-the-ai-vs-auto-chip-war/conf 70%
- 2027-04-30pendingQ2 window check-in (50%)
- 2027-01-01 → 2027-12-31pendingTSMC Tainan + Arizona fabs reach volume productionHow: TSMC publicly confirms volume production at new Tainan (H1 2027) and Arizona (H2 2027) fabsSource: https://dataconomy.com/2026/03/31/tsmcs-advanced-chip-capacity-is-booked-out-through-2028/conf 70%
- 2026-09-01 → 2028-06-30pendingRobotaxi fleet expansion explicitly chip-constrained in public disclosuresHow: >=1 major robotaxi operator (Waymo/Tesla/Zoox/Uber) publicly attributes deployment delay to autonomous-vehicle chip supplySource: https://enkiai.com/ai-market-intelligence/semiconductor-scarcity-2026-the-ai-vs-auto-chip-war/conf 45%Notes: Critical for Blundin's claim — chips as SOLE gating factor. Lower confidence because demand-side and regulatory factors equally constrain rollout.
- 2027-10-29pendingQ3 window check-in (75%)
No downstream cascades — this prediction is a leaf in the dependency graph.
What if this resolves?
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Network propagation neighbors
Top incoming (parents)
Edges that influence THIS node's belief
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | S_AGI_MID_2029 AGI mid: Kurzweil 2029 path | 35.0% | 0.600 | 0.050 | -0.219 |
| killer | TK03 AI Regulatory Moratorium (EU/US Capability Freeze) | 10.0% | 0.050 | 0.600 | +0.083 |
| killer | TK02 AI Compute Supply Shock (TSMC/Taiwan Disruption) | 12.0% | 0.050 | 0.600 | +0.072 |
| killer | TK01 AGI Capability Plateau (2026-27 Training Stall) | 15.0% | 0.050 | 0.600 | +0.056 |
| killer | TK09 Energy Grid Cap (Data Center Power Wall) | 35.0% | 0.050 | 0.600 | -0.054 |
Top outgoing (children)
Predictions THIS node influences
No outgoing edges.
Ticker exposure
Beneficiaries (24)
Adverse (6)
Prerequisites (6)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | S_AGI_MID_2029 | AGI mid: Kurzweil 2029 path | agi_general_capability | — |
| killer | TK09 | Energy Grid Cap (Data Center Power Wall) | — | — |
| killer | TK05 | Rate Regime Persistence (10y > 5% through 2028) | — | — |
| killer | TK01 | AGI Capability Plateau (2026-27 Training Stall) | — | — |
| killer | TK02 | AI Compute Supply Shock (TSMC/Taiwan Disruption) | — | — |
| killer | TK03 | AI Regulatory Moratorium (EU/US Capability Freeze) | — | — |
Dependents (0)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| No dependents | ||||
Raw metadata
{
"nia": false,
"url": "https://www.youtube.com/watch?v=wMLcIWLlcWg",
"mode": "THESIS",
"role": "Host",
"context": "the thing that would make it later is purely the shortage of chips. Like the technology will be there and the demand will be there long before the chips are there",
"verbatim": "the thing that would make it later is purely the shortage of chips. Like the technology will be there and the demand will be there long before the chips are there",
"conv_cues": "purely",
"direction": "HAPPEN",
"timeframe": "unspecified future",
"conv_level": "HIGH",
"milestones": [
{
"kind": "llm_pre_event",
"label": "TSMC CEO confirms AI chip shortages persist beyond 2027",
"source": "https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.html",
"status": "hit",
"weight": 0.4,
"ordinal": -8,
"source_id": null,
"confidence": 0.95,
"source_url": "https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.html",
"expected_date": "2026-04-30",
"observed_date": "2026-04-30",
"research_origin": "deep_research",
"measurement_criterion": "TSMC executive (CEO C.C. Wei or equivalent) publicly states advanced-node shortages will persist beyond 2027"
},
{
"kind": "llm_pre_event",
"label": "NVIDIA locks >50% of TSMC advanced capacity through 2027",
"source": "https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.html",
"status": "hit",
"weight": 0.4,
"ordinal": -7,
"source_id": null,
"confidence": 0.9,
"source_url": "https://www.tweaktown.com/news/111178/tsmc-cant-keep-up-with-ai-chip-demand-with-shortages-projected-to-last-beyond-2027/index.html",
"expected_date": "2026-04-30",
"observed_date": "2026-04-30",
"research_origin": "deep_research",
"measurement_criterion": "Trade press/analyst reporting confirms NVIDIA controls >50% of TSMC advanced-node capacity through 2026-2027"
},
{
"kind": "quartile_checkpoint",
"label": "Q1 window check-in (25%)",
"status": "pending",
"weight": 0.05,
"ordinal": -6,
"source_id": null,
"expected_date": "2026-10-29",
"observed_date": null
},
{
"kind": "llm_pre_event",
"label": "600K vehicles lost in 2026 due to chip scarcity (UBS forecast)",
"source": "https://enkiai.com/ai-market-intelligence/semiconductor-scarcity-2026-the-ai-vs-auto-chip-war/",
"status": "pending",
"weight": 0.4,
"ordinal": -5,
"source_id": null,
"confidence": 0.7,
"source_url": "https://enkiai.com/ai-market-intelligence/semiconductor-scarcity-2026-the-ai-vs-auto-chip-war/",
"expected_date": "2027-02-14",
"research_origin": "deep_research",
"expected_date_range": {
"to": "2027-03-31",
"from": "2026-12-31"
},
"measurement_criterion": "Annual vehicle production figures show >=500K vehicle shortfall vs prior plan attributable to AI/auto-chip shortage"
},
{
"kind": "quartile_checkpoint",
"label": "Q2 window check-in (50%)",
"status": "pending",
"weight": 0.05,
"ordinal": -4,
"source_id": null,
"expected_date": "2027-04-30",
"observed_date": null
},
{
"kind": "llm_post_event",
"label": "TSMC Tainan + Arizona fabs reach volume production",
"source": "https://dataconomy.com/2026/03/31/tsmcs-advanced-chip-capacity-is-booked-out-through-2028/",
"status": "pending",
"weight": 0.4,
"ordinal": -3,
"source_id": null,
"confidence": 0.7,
"source_url": "https://dataconomy.com/2026/03/31/tsmcs-advanced-chip-capacity-is-booked-out-through-2028/",
"expected_date": "2027-07-02",
"res
... (truncated)