Maine data center moratorium gives other states / Elon time to move compute to orbit.
Predictor: Peter Diamandis · ep#248 "Sam Altman's Attack, Amazon vs. Starlink, and What Opus 4.7 Actually Means | #248" · source
Prediction text
Maine data center moratorium gives other states / Elon time to move compute to orbit. | the state of Maine passed the first ever statewide data center ban in the United States legislature passed an 18-month moratorum on new data centers to give the task force time to study their impact, which means time for all the other data centers to pull out ahead and for Elon's efforts to go to orbit to take place
Watch events: Starcloud Blackwell satellite (Oct 2026); Google Project Suncatcher demo satellite; FCC DC filings
Verbatim quote
the state of Maine passed the first ever statewide data center ban in the United States legislature passed an 18-month moratorum on new data centers to give the task force time to study their impact, which means time for all the other data centers to pull out ahead and for Elon's efforts to go to orbit to take place
Predictor: Peter Diamandis
Calibration plot (stated vs observed)
Evidence about this node from Peter Diamandis is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class: regulatory_freeze_window
Major-country regulatory pause/moratorium on AI capability research lasting >6 months
Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.
Probability over time
Milestone chain
- 2026-04-09hitMaine LD 307 18-month data center moratorium passes Legislature with bipartisan supportHow: Maine Morning Star / state government records confirm bill passage through LegislatureSource: deep_research_enrichedconf 98%
- 2026-04-17overdueQ1 window check-in (25%)
- 2026-04-25hitGov. Mills vetoes Maine data center moratorium (LD 307)How: Maine Public / WBUR / TechCrunch confirm gubernatorial veto of LD 307Source: deep_research_enrichedconf 98%
- 2026-04-29missMaine House sustains Mills' veto — moratorium dies; thesis premise (statewide moratorium gives time) invalidatedHow: Maine House vote fails to override veto; LD 307 dead. Underlying premise of prediction (Maine moratorium creates window for orbital migration) negated.Source: deep_research_enrichedconf 95%
- 2026-04-29hitMaine Data Center Advisory Council established by EO (replaces moratorium pathway)How: Mills EO signed creating advisory council to study impacts; substitute for moratoriumSource: deep_research_enrichedconf 90%
- 2026-08-01pendingQ2 window check-in (50%)
- 2026-11-15pendingQ3 window check-in (75%)
- 2026-10-01 → 2026-12-31pendingSpaceX Starcloud-2 launch with multi-GPU (Blackwell) orbital compute payloadHow: Starcloud announcement / launch confirmation of Starcloud-2 with 100x first-sat power and multi-GPU including BlackwellSource: deep_research_enrichedconf 55%
- 2026-06-01 → 2027-08-31pendingOther state passes data-center moratorium or significant siting restriction (substitution test)How: A US state other than Maine passes statewide moratorium or significant siting restriction on >20MW data centers, providing alternate pathway for thesisSource: deep_research_enrichedconf 40%
What if this resolves?
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Raw metadata
{
"trf": 0.8253269695122971,
"kappa": 0.8684,
"base_rate": 0.05,
"predictor": "Peter Diamandis",
"total_llr": -0.4054651081081644,
"grace_days": 7,
"bayesian_v2": true,
"prior_logit": -0.8179802314902693,
"bayes_factor": "1.4:1 against",
"blend_reason": "blend 42% inside / 57% outside (TRF=0.825, base_rate=0.050 from regulatory_freeze_window)",
"inside_prior": 0.3061925688067514,
"kappa_source": "predictor_table",
"n_milestones": 1,
"blend_applied": true,
"contributions": [
{
"llr": -0.4054651081081644,
"kind": "quartile_checkpoint",
"kappa": 0.8684,
"label": "Q1 window check-in (25%)",
"weight": 0.05,
"strength": "weak",
"confidence": null,
"source_url": null,
"adjusted_llr": -0.35210589988112995,
"expected_date": "2026-04-17",
"measurement_criterion": null
}
],
"evidence_kind": "metadata_milestone_miss_sweep",
"inside_source": "history_v2",
"inside_weight": 0.422271121341392,
"outside_weight": 0.577728878658608,
"posterior_prob": 0.10018407123826027,
"posterior_logit": -1.1700861313713993,
"predictor_brier": 0.02669,
"inside_posterior": 0.23683941597575228,
"blended_posterior": 0.10018407123826027,
"reference_class_id": "regulatory_freeze_window",
"total_adjusted_llr": -0.35210589988112995,
"predictor_n_resolved": 14
}Network propagation neighbors
Top incoming (parents)
Edges that influence THIS node's belief
Top outgoing (children)
Predictions THIS node influences
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | 246_013 Artemis 4 crewed moon landing mission to south pole in early — Peter Diamandis | 42.2% | 0.650 | 0.050 | -0.089 |
| prereq | 230_016 Data center regulation in NY/elsewhere will accelerate movin — Alex Wissner-Gross | 54.7% | 0.920 | 0.050 | -0.087 |
| prereq | 246_020 China will land on moon by 2030 (credible competitive missio — Alex Wissner-Gross | 31.7% | 0.500 | 0.050 | -0.054 |
| prereq | 231_032 Everyone (China included) will want their own Dyson swarms/S — Alex Wissner-Gross | 31.2% | 0.500 | 0.050 | -0.050 |
| prereq | 232_049 Dyson swarm of AI orbital data centers will be built by disa — Alex Wissner-Gross | 19.0% | 0.300 | 0.050 | -0.023 |
Ticker exposure
Beneficiaries (22)
Adverse (3)
Prerequisites (3)
Dependents (5)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | 230_016 | Data center regulation in NY/elsewhere will accelerate moving compute to orbit (Dyson swarm). | Space | — |
| prereq | 246_013 | Artemis 4 crewed moon landing mission to south pole in early 2028. | Space | — |
| prereq | 231_032 | Everyone (China included) will want their own Dyson swarms/Saturnian rings in solar-synchronous orbit. | Space | — |
| prereq | 246_020 | China will land on moon by 2030 (credible competitive mission). | Geopolitics | — |
| prereq | 232_049 | Dyson swarm of AI orbital data centers will be built by disassembling the moon via mass drivers. | Space | — |
Expected milestones (1)
| Expected by | Description | Status |
|---|---|---|
| 2027-12-31 | [Space 2027-12] ncatcher demo satellite; FCC DC filings [248_041] Starcloud Blackwell satellite (Oct 2026); Google Project Suncatcher demo satellite; FCC DC filings [SPC_012] Starship ship-to-ship propellant transfer demo | pending |
Linked documents (1)
| Sim | Source | Title | Market prob | Polarity | Reviewed | Published |
|---|---|---|---|---|---|---|
| 0.551 | polymarket | Will Graham Platner be the Democratic nominee for Senate in Maine? | 98% | mentions | pending | 2025-09-15 |
Raw metadata
{
"nia": false,
"qty": "18 months",
"url": "https://www.youtube.com/watch?v=LVvleNtllPk",
"mode": "FORECAST",
"role": "Host",
"context": "Maine's 18-month moratorum... time for all the other data centers to pull out ahead and for Elon's efforts to go to orbit to take place",
"to_year": 2027,
"verbatim": "the state of Maine passed the first ever statewide data center ban in the United States legislature passed an 18-month moratorum on new data centers to give the task force time to study their impact, which means time for all the other data centers to pull out ahead and for Elon's efforts to go to orbit to take place",
"direction": "HAPPEN",
"from_year": 2026,
"timeframe": "18-month moratorium window",
"conv_level": "MEDIUM",
"milestones": [
{
"kind": "llm_pre_event",
"label": "Maine LD 307 18-month data center moratorium passes Legislature with bipartisan support",
"source": "deep_research_enriched",
"status": "hit",
"weight": 0.4,
"ordinal": -9,
"source_id": null,
"confidence": 0.98,
"source_url": "https://mainemorningstar.com/2026/04/09/landmark-data-center-moratorium-passes-maine-legislature/",
"expected_date": "2026-04-09",
"observed_date": "2026-04-09",
"research_origin": "deep_research",
"measurement_criterion": "Maine Morning Star / state government records confirm bill passage through Legislature"
},
{
"kind": "quartile_checkpoint",
"label": "Q1 window check-in (25%)",
"status": "overdue",
"weight": 0.05,
"ordinal": -8,
"source_id": null,
"expected_date": "2026-04-17",
"observed_date": null,
"miss_emitted_at": "2026-05-02T22:07:21.384228+00:00",
"miss_emitted_by": "metadata_milestone_sweep"
},
{
"kind": "llm_pre_event",
"label": "Gov. Mills vetoes Maine data center moratorium (LD 307)",
"source": "deep_research_enriched",
"status": "hit",
"weight": 0.4,
"ordinal": -7,
"source_id": null,
"confidence": 0.98,
"source_url": "https://www.mainepublic.org/politics/2026-04-25/janet-mills-vetoes-moratorium-on-data-center-development-in-maine",
"expected_date": "2026-04-25",
"observed_date": "2026-04-25",
"research_origin": "deep_research",
"measurement_criterion": "Maine Public / WBUR / TechCrunch confirm gubernatorial veto of LD 307"
},
{
"kind": "llm_pre_event",
"label": "Maine House sustains Mills' veto — moratorium dies; thesis premise (statewide moratorium gives time) invalidated",
"source": "deep_research_enriched",
"status": "miss",
"weight": 0.4,
"ordinal": -6,
"source_id": null,
"confidence": 0.95,
"source_url": "https://www.centralmaine.com/2026/04/29/maine-legislature-sustains-mills-data-center-moratorium-veto/",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29",
"research_origin": "deep_research",
"measurement_criterion": "Maine House vote fails to override veto; LD 307 dead. Underlying premise of prediction (Maine moratorium creates window for orbital migration) negated."
},
{
"kind": "llm_post_event",
"label": "Maine Data Center Advisory Council established by EO (replaces moratorium pathway)",
"source": "deep_research_enriched",
"status": "hit",
"weight": 0.4,
"ordinal": -5,
"source_id": null,
"confidence": 0.9,
"source_url": "https://www.maine.gov/governor/mills/news/governor-mills-signs-executive-order-establish-maine-data-center-advisory-council-2026-04-29",
"expected_date": "2026-04-29",
"observed_date": "2026-04-29",
"research_origin": "deep_research",
"measurement_criterion": "Mills EO signed creating advisory council to study impacts; substitute for moratorium"
},
{
"kind": "quartile_checkpoint",
"label": "Q2 window check-in (50%)",
"status": "
... (truncated)