Memory stocks are THE primary beneficiary of the semiconductor growth cycle extending into 2026 ('Memory Wall' dominant constraint).
Predictor: Joseph Moore
Prediction text
Memory stocks are THE primary beneficiary of the semiconductor growth cycle extending into 2026 ('Memory Wall' dominant constraint). | HBM4 allocation + DRAM contract pricing
Key catalyst: HBM4 allocation + DRAM contract pricing
Watch events: SK Hynix / Samsung / Micron HBM allocation disclosures; DRAM contract pricing
Resolution evidence
SK Hynix, Samsung, Micron all reporting HBM3E sold out through 2026; HBM4 allocations in motion. Memory sector outperformed logic in Q4-2025 to Q1-2026.
Predictor: Joseph Moore
Calibration plot (stated vs observed)
Evidence about this node from Joseph Moore is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).
Reference class: memory_supercycle_2y
Named memory-market supercycle (DRAM/HBM) persists/intensifies into stated year (n>=2y forward)
Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.
Probability over time
Milestone chain
- 2025-12-24hitHBM3E contract pricing rises ~20% for 2026 supplyHow: Samsung and SK Hynix raise HBM3E supply contract prices ~20% for 2026 NVIDIA H200 / ASIC demand cycleSource: https://www.trendforce.com/news/2025/12/24/news-samsung-sk-hynix-reportedly-plan-20-hbm3e-price-hike-for-2026-as-nvidia-h200-asic-demand-rises/conf 99%
- 2026-01-31hitSK Hynix CFO confirms 2026 HBM supply 'sold out'How: SK Hynix CFO publicly confirms 2026 HBM supply 100% allocated/sold out on Q4 2025 earnings call or industry forumSource: https://introl.com/blog/samsung-sk-hynix-stargate-hbm4-memory-crisis-january-2026conf 95%
- 2026-02-26overdueQ1 window check-in (25%)
- 2026-02-28hitHBM4 mass production launches February 2026 at SK HynixHow: SK Hynix begins HBM4 commercial mass production at M15X fab with initial output ~10K wafers/monthSource: https://introl.com/blog/south-korea-hbm4-stargate-memory-supercycle-2026conf 95%
- 2026-03-31overdueServer DRAM contract prices rise 55-60% in Q1 2026How: TrendForce reports Q1 2026 server DRAM contract prices up 55-60% sequentially per industry dataSource: https://siliconanalysts.com/tools/hbm-analysisconf 90%
- 2026-04-23overdueQ2 window check-in (50%)
- 2026-02-01 → 2026-09-30pendingHBM4 reaches $500/stack pricing benchmarkHow: Industry pricing data confirms HBM4 average selling price at or near $500/stack (vs HBM3E ~$300, HBM3 ~$200)Source: https://siliconanalysts.com/tools/hbm-analysisconf 78%
- 2026-06-18pendingQ3 window check-in (75%)
- 2026-12-31pendingMemory stocks (Micron, SK Hynix, Samsung) outperform PHLX SOX in 2026How: Equal-weighted basket of MU + 000660.KS + 005930.KS total return for 2026 exceeds PHLX SOX index total returnSource: https://www.eenewseurope.com/en/memory-price-surge-samsung-sk-hynix-micron/conf 65%
What if this resolves?
Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"
Evidence chain
Raw metadata
{
"trf": 0.6127227050582519,
"kappa": 0.5833,
"base_rate": null,
"predictor": "Joseph Moore",
"total_llr": 1.6094379124341,
"bayesian_v2": true,
"prior_logit": 0.977173059159139,
"bayes_factor": "2.6:1 favoring",
"blend_reason": "no reference_class linked",
"inside_prior": 0.7265469295024153,
"kappa_source": "predictor_table",
"blend_applied": false,
"contributions": [
{
"llr": 1.6094379124341,
"kappa": 0.5833,
"label": "SK Hynix posting op margins above NVIDIA itself is unprecedented and explicitly validates 'memory stocks THE primary ben",
"adjusted_llr": 0.9387851343228107
}
],
"evidence_kind": "intake_event_update",
"inside_source": "history_v2",
"inside_weight": 1,
"outside_weight": 0,
"posterior_prob": 0.8716870414367551,
"evidence_origin": "daily_intake",
"llm_suggestions": [
{
"polarity": "corroborates",
"status_change": "unchanged",
"evidence_strength": "strong",
"delta_prob_suggestion": 0.09
}
],
"posterior_logit": 1.91595819348195,
"predictor_brier": 0.0001,
"evidence_doc_ids": [
"1760"
],
"inside_posterior": 0.8716870414367551,
"blended_posterior": 0.8716870414367551,
"reference_class_id": null,
"total_adjusted_llr": 0.9387851343228107,
"predictor_n_resolved": 1
}Raw metadata
{
"trf": 0.6650500679109432,
"kappa": 0.5833,
"base_rate": null,
"predictor": "Joseph Moore",
"total_llr": -1.2163953243244932,
"grace_days": 7,
"bayesian_v2": true,
"prior_logit": 1.289190439326426,
"bayes_factor": "2.0:1 against",
"blend_reason": "no reference_class linked",
"inside_prior": 0.7840101311138036,
"kappa_source": "predictor_table",
"n_milestones": 3,
"blend_applied": false,
"contributions": [
{
"llr": -0.4054651081081644,
"kind": "quartile_checkpoint",
"kappa": 0.5833,
"label": "Q1 window check-in (25%)",
"weight": 0.05,
"strength": "weak",
"confidence": null,
"source_url": null,
"adjusted_llr": -0.2365077975594923,
"expected_date": "2026-02-26",
"measurement_criterion": null
},
{
"llr": -0.4054651081081644,
"kind": "llm_pre_event",
"kappa": 0.52497,
"label": "Server DRAM contract prices rise 55-60% in Q1 2026",
"weight": 0.4,
"strength": "weak",
"confidence": 0.9,
"source_url": "https://siliconanalysts.com/tools/hbm-analysis",
"adjusted_llr": -0.21285701780354307,
"expected_date": "2026-03-31",
"measurement_criterion": "TrendForce reports Q1 2026 server DRAM contract prices up 55-60% sequentially per industry data"
},
{
"llr": -0.4054651081081644,
"kind": "quartile_checkpoint",
"kappa": 0.5833,
"label": "Q2 window check-in (50%)",
"weight": 0.05,
"strength": "weak",
"confidence": null,
"source_url": null,
"adjusted_llr": -0.2365077975594923,
"expected_date": "2026-04-23",
"measurement_criterion": null
}
],
"evidence_kind": "metadata_milestone_miss_sweep",
"inside_source": "history_v2",
"inside_weight": 0.5344649524623397,
"outside_weight": 0.4655350475376603,
"posterior_prob": 0.6464150052729245,
"posterior_logit": 0.6033178264038983,
"predictor_brier": 0.0001,
"inside_posterior": 0.6464150052729245,
"blended_posterior": 0.6464150052729245,
"reference_class_id": null,
"total_adjusted_llr": -0.6858726129225277,
"predictor_n_resolved": 1
}Network propagation neighbors
Top incoming (parents)
Edges that influence THIS node's belief
Top outgoing (children)
Predictions THIS node influences
| Kind | Node | Their prob | P(c|s=T) | P(c|s=F) | Δ implied |
|---|---|---|---|---|---|
| prereq | 247_023 AI will be able to do everything a white collar worker does — Dave Blundin | 40.8% | 0.720 | 0.050 | +0.166 |
| prereq | 242_031 Most large companies' business models will be disrupted in 2 — Peter Diamandis | 36.1% | 0.650 | 0.050 | +0.158 |
| prereq | 248_033 Superhuman AI will make BCI-enhanced humans irrelevant compa — Dave Blundin | 36.7% | 0.600 | 0.050 | +0.113 |
| prereq | 232_046 SpaceX will build a system that allows anyone to travel to m — Elon Musk | 32.5% | 0.500 | 0.050 | +0.077 |
| prereq | 246_010 SpaceX/XAI/Tesla will be the first $100 trillion company wit — Peter Diamandis | 42.7% | 0.600 | 0.050 | +0.053 |
Ticker exposure
Beneficiaries (24)
Adverse (4)
Prerequisites (3)
Dependents (11)
| Type | Pred | Title | Domain | Lag |
|---|---|---|---|---|
| prereq | 247_023 | AI will be able to do everything a white collar worker does imminently | AI | — |
| prereq | 231_035 | SpaceX/Elon will consume all their launch capacity for Starlink, leaving other providers constrained. | Space | — |
| prereq | 242_031 | Most large companies' business models will be disrupted in 2-5 years | Markets/Stocks | — |
| prereq | 230_006 | The frontier models will go dark — kept internal to benefit the labs in an all-out battle. | AI | — |
| prereq | 247_055 | Acquisition of small specialized AI teams for hundreds of millions will become common | AI | — |
| prereq | 246_010 | SpaceX/XAI/Tesla will be the first $100 trillion company within 5 years. | Markets/Stocks | — |
| prereq | 248_033 | Superhuman AI will make BCI-enhanced humans irrelevant compared to AI 2 years from today. | AI | — |
| prereq | 232_051 | Amazon's satellite construction outpaces launch capacity; duopoly between Starlink and Amazon LEO. | Space | — |
| prereq | 242_005 | Starship launch cadence will reach one every 5.3 minutes (274/day) | Space | — |
| prereq | 232_046 | SpaceX will build a system that allows anyone to travel to moon and Mars after Starship V3 flies repeatedly. | Space | — |
| prereq | 242_038 | Humans will land on the moon again in 2-3 years via Starship | Space | — |
Validations (1)
| Observed at | Status | By | Notes |
|---|---|---|---|
| 2026-04-29 | partial | thesis_timeline_v1.0_import | SK Hynix, Samsung, Micron all reporting HBM3E sold out through 2026; HBM4 allocations in motion. Memory sector outperformed logic in Q4-2025 to Q1-2026. |
Linked documents (1)
| Sim | Source | Title | Market prob | Polarity | Reviewed | Published |
|---|---|---|---|---|---|---|
| 0.704 | gdelt | 244576 | — | mentions | pending | 2026-04-30 |
Raw metadata
{
"nia": false,
"mode": "FORECAST",
"role": "Cited-Analyst",
"context": "Moore identifies memory as primary beneficiary — logic processors outpace memory retrieval speed, creating acute HBM/DDR5 bandwidth bottleneck.",
"to_year": 2026,
"conv_cues": "absolute primary beneficiary",
"direction": "UP",
"from_year": 2026,
"timeframe": "through 2026",
"conv_level": "HIGH",
"milestones": [
{
"kind": "llm_pre_event",
"label": "HBM3E contract pricing rises ~20% for 2026 supply",
"source": "https://www.trendforce.com/news/2025/12/24/news-samsung-sk-hynix-reportedly-plan-20-hbm3e-price-hike-for-2026-as-nvidia-h200-asic-demand-rises/",
"status": "hit",
"weight": 0.4,
"ordinal": -8,
"source_id": null,
"confidence": 0.99,
"source_url": "https://www.trendforce.com/news/2025/12/24/news-samsung-sk-hynix-reportedly-plan-20-hbm3e-price-hike-for-2026-as-nvidia-h200-asic-demand-rises/",
"expected_date": "2025-12-24",
"observed_date": "2025-12-24",
"research_origin": "deep_research",
"measurement_criterion": "Samsung and SK Hynix raise HBM3E supply contract prices ~20% for 2026 NVIDIA H200 / ASIC demand cycle"
},
{
"kind": "llm_pre_event",
"label": "SK Hynix CFO confirms 2026 HBM supply 'sold out'",
"source": "https://introl.com/blog/samsung-sk-hynix-stargate-hbm4-memory-crisis-january-2026",
"status": "hit",
"weight": 0.4,
"ordinal": -7,
"source_id": null,
"confidence": 0.95,
"source_url": "https://introl.com/blog/samsung-sk-hynix-stargate-hbm4-memory-crisis-january-2026",
"expected_date": "2026-01-31",
"observed_date": "2026-01-31",
"research_origin": "deep_research",
"measurement_criterion": "SK Hynix CFO publicly confirms 2026 HBM supply 100% allocated/sold out on Q4 2025 earnings call or industry forum"
},
{
"kind": "quartile_checkpoint",
"label": "Q1 window check-in (25%)",
"status": "overdue",
"weight": 0.05,
"ordinal": -6,
"source_id": null,
"expected_date": "2026-02-26",
"observed_date": null,
"miss_emitted_at": "2026-05-02T22:07:21.384228+00:00",
"miss_emitted_by": "metadata_milestone_sweep"
},
{
"kind": "llm_pre_event",
"label": "HBM4 mass production launches February 2026 at SK Hynix",
"source": "https://introl.com/blog/south-korea-hbm4-stargate-memory-supercycle-2026",
"status": "hit",
"weight": 0.4,
"ordinal": -5,
"source_id": null,
"confidence": 0.95,
"source_url": "https://introl.com/blog/south-korea-hbm4-stargate-memory-supercycle-2026",
"expected_date": "2026-02-28",
"observed_date": "2026-02-28",
"research_origin": "deep_research",
"measurement_criterion": "SK Hynix begins HBM4 commercial mass production at M15X fab with initial output ~10K wafers/month"
},
{
"kind": "llm_pre_event",
"label": "Server DRAM contract prices rise 55-60% in Q1 2026",
"source": "https://siliconanalysts.com/tools/hbm-analysis",
"status": "overdue",
"weight": 0.4,
"ordinal": -4,
"source_id": null,
"confidence": 0.9,
"source_url": "https://siliconanalysts.com/tools/hbm-analysis",
"expected_date": "2026-03-31",
"miss_emitted_at": "2026-05-02T22:07:21.384228+00:00",
"miss_emitted_by": "metadata_milestone_sweep",
"research_origin": "deep_research",
"measurement_criterion": "TrendForce reports Q1 2026 server DRAM contract prices up 55-60% sequentially per industry data"
},
{
"kind": "quartile_checkpoint",
"label": "Q2 window check-in (50%)",
"status": "overdue",
"weight": 0.05,
"ordinal": -3,
"source_id": null,
"expected_date": "2026-04-23",
"observed_date": null,
"miss_emitted_at": "2026-05-02T22:07:21.384228+00:00",
"miss_emitted_by": "metadata_milestone_sweep"
... (truncated)