← Cockpit
SPC_013predictionSpaceNASA-cadence-6-to-9-months

As 15th NASA Administrator (confirmed December 2025), Isaacman predicts NASA will launch astronauts into space every 6-9 months via commercial partnerships — plus aggressive reinforcement of lunar-lander programs to establish a permanent surface presen...

Predictor: Jared Isaacman

Prior probability
50.0%
Current probability
46.0%
evolves via intake + LBP
Conviction
4/5
Signal quality
B
Resolution
in_progress
Window
2026-01-01 – 2030-10-31
Edges in / out
4 / 0
Tickers exposed
10

Prediction text

As 15th NASA Administrator (confirmed December 2025), Isaacman predicts NASA will launch astronauts into space every 6-9 months via commercial partnerships — plus aggressive reinforcement of lunar-lander programs to establish a permanent surface presence; ushering in a 'new Golden Age of Science and Discovery'. | Artemis II crewed launch

Key catalyst: Artemis II crewed launch

Watch events: NASA crewed-launch cadence; Artemis II/III timeline

Resolution evidence

Status: in_progress

Isaacman confirmed NASA Admin Dec 2025; commercial LEO program, Artemis II/III scheduled 2025-2027 consistent with cadence.

Predictor: Jared Isaacman

κ + Brier as of 2026-05-22
κ (discount)
0.500
Brier
Hits / Misses
0 / 0
Hit rate

Evidence about this node from Jared Isaacman is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).

Reference class

Not linked

This node isn't linked to a reference class. The Bayesian update applies without outside-view blending.

Probability over time

2 prob_history rows
0%25%50%75%100%prior 50%2026-04-302026-04-30
intake v2milestone miss sweeplbp propagationreference class assignedlegacy v1prior_prob (analyst seed)current = 46.0%

Milestone chain

Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.
Leading chain: 2 fired ✓ · 8 pending
  1. 2026-04-01hitArtemis II crewed lunar flyby launches successfully
    How: NASA SLS launches Artemis II Orion capsule with 4 astronauts (Wiseman, Glover, Koch, Hansen) on first crewed lunar flyby since Apollo 17
    Source: NASA Artemis II launch updates / NBC News live coverageconf 99%
    Notes: HIT — Artemis II launched April 1, splashdown April 10 — first crewed Moon mission since 1972. Direct precondition for any 6-9 month cadence claim.
  2. 2026-04-14hitIsaacman publicly commits to 'frequency measured in months, not years'
    How: NASA Administrator Isaacman publicly states intent to launch lunar rockets at monthly cadence in post-Artemis II briefing
    Source: Via Satellite — Isaacman Hails Artemis II Success, Previews Artemis III/IV (April 14, 2026)conf 95%
    Notes: HIT — Isaacman explicitly stated 'frequency measured in months, not years' for moon rockets in post-Artemis II briefing. Direct verbal restatement of SPC_013.
  3. 2026-11-14pendingQ1 window check-in (25%)
  4. 2026-04-15 → 2027-06-30pendingArtemis III crewed lunar landing target date announced (2027)
    How: NASA officially confirms Artemis III crewed surface landing target in 2027 with Starship HLS as lander
    Source: Via Satellite — Artemis III in 2027 planconf 65%
    Notes: Artemis III date will reveal if 6-9 month cadence holds. Wikipedia notes ongoing slippage risk.
  5. 2026-09-01 → 2027-12-31pendingCommercial astronaut mission cadence reaches ≥4/year
    How: ≥4 commercial crewed launches (Polaris, Axiom, peer) in 12-month rolling window via SpaceX or Boeing partnerships
    Source: Anticipated — SpaceX, Axiom Space announcementsconf 70%
    Notes: Isaacman explicitly emphasized commercial astronaut monetization. ≥4/yr meets the 'every 6-9 months' bar with 50% safety margin.
  6. 2026-10-01 → 2027-12-31pendingSpaceX Starship uncrewed lunar demo completes
    How: SpaceX Starship HLS performs uncrewed Moon landing demonstration mission per NASA contract
    Source: Webpronews — SpaceX shelving Mars to win lunar race; nextspaceflight Starship HLS democonf 55%
    Notes: Cascade — Musk's Feb 2026 pivot from Mars to lunar prioritization confirms Isaacman's lunar emphasis.
  7. 2027-09-28pendingQ2 window check-in (50%)
  8. 2028-08-10pendingQ3 window check-in (75%)

No downstream cascades — this prediction is a leaf in the dependency graph.

What if this resolves?

Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 46%)

Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"

Evidence chain

Every probability update with full Bayesian provenance — chronological, latest first
LBP2026-04-30T16:39:51Z46.0%-1.3pp
Network propagation: 47.4% → 46.0%
5-iter LBP, residual 0.00825 · damping 0.5, w_intrinsic 0.5 · method lbp_v2 · run 0c8a4ea3
LBP2026-04-30T02:18:57Z47.4%-2.6pp
Network propagation: 50.0% → 47.4%
5-iter LBP, residual 0.00825 · damping 0.5, w_intrinsic 0.5 · method lbp_v1 · run 592311ef

Network propagation neighbors

Top edges sorted by latest LBP cross-impact
All propagation →

Top incoming (parents)

Edges that influence THIS node's belief

KindNodeTheir probP(c|s=T)P(c|s=F)Δ implied
killerTK15
SpaceX Starship Catastrophic Failure
12.0%0.0500.500-0.014

Top outgoing (children)

Predictions THIS node influences

No outgoing edges.

Ticker exposure

10 ticker(s) linked

Beneficiaries (5)

LUNRFLYNNEBALMT

Prerequisites (4)

Predictions that must hit first
TypePredTitleDomainLag
correlateS_MARS_2028Mars uncrewed: 2028 transfer window (most likely first attempt)mars_uncrewed_landing
correlateS_MARS_2026Mars uncrewed: 2026 transfer windowmars_uncrewed_landing
correlateS_MARS_2031PLUSMars uncrewed: 2031+ transfer window or further delaymars_uncrewed_landing
killerTK15SpaceX Starship Catastrophic Failure

Dependents (0)

Predictions enabled by this
TypePredTitleDomainLag
No dependents

Validations (1)

Resolution events
Observed atStatusByNotes
2026-04-29partialthesis_timeline_v1.0_importIsaacman confirmed NASA Admin Dec 2025; commercial LEO program, Artemis II/III scheduled 2025-2027 consistent with cadence.

Linked documents (4)

Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
SimSourceTitleMarket probPolarityReviewedPublished
0.683manifoldArtemis III launches before 2029?85%mentionspending2026-04-28
0.570gdeltnasas artemis ii moonship returns home to its launch site after historic voyagementionspending2026-04-30
0.561manifoldWill New Glenn 7x2 ever fly again?94%mentionspending2026-05-29
0.559gdelttrump afirma que nasa podria poner astronautas en superficie lunar en su mandatomentionspending2026-04-30

Raw metadata

From Thesis_Timeline_v1.0_FINAL workbook
{
  "nia": false,
  "qty": "6-9 month cadence",
  "mode": "FORECAST",
  "role": "Cited-Other",
  "context": "Confirmed NASA Admin role. Extends 242_039 (NASA Mars microbes), CYB_021 (AI in orbital ops). Specific cadence commitment.",
  "to_year": 2030,
  "conv_cues": "NASA Administrator FIRST_PERSON; specific cadence",
  "direction": "HAPPEN",
  "from_year": 2026,
  "timeframe": "2026-2030",
  "conv_level": "HIGH",
  "milestones": [
    {
      "kind": "llm_pre_event",
      "label": "Artemis II crewed lunar flyby launches successfully",
      "notes": "HIT — Artemis II launched April 1, splashdown April 10 — first crewed Moon mission since 1972. Direct precondition for any 6-9 month cadence claim.",
      "source": "NASA Artemis II launch updates / NBC News live coverage",
      "status": "hit",
      "weight": 0.4,
      "ordinal": -10,
      "source_id": null,
      "confidence": 0.99,
      "source_url": "https://www.nasa.gov/blogs/missions/2026/04/01/live-artemis-ii-launch-day-updates/",
      "expected_date": "2026-04-01",
      "observed_date": "2026-04-01",
      "research_origin": "deep_research",
      "measurement_criterion": "NASA SLS launches Artemis II Orion capsule with 4 astronauts (Wiseman, Glover, Koch, Hansen) on first crewed lunar flyby since Apollo 17"
    },
    {
      "kind": "llm_pre_event",
      "label": "Isaacman publicly commits to 'frequency measured in months, not years'",
      "notes": "HIT — Isaacman explicitly stated 'frequency measured in months, not years' for moon rockets in post-Artemis II briefing. Direct verbal restatement of SPC_013.",
      "source": "Via Satellite — Isaacman Hails Artemis II Success, Previews Artemis III/IV (April 14, 2026)",
      "status": "hit",
      "weight": 0.4,
      "ordinal": -9,
      "source_id": null,
      "confidence": 0.95,
      "source_url": "https://www.satellitetoday.com/government-military/2026/04/14/nasa-administrator-isaacman-hails-the-success-of-artemis-previews-plans-for-artemis-iii-and-iv/",
      "expected_date": "2026-04-14",
      "observed_date": "2026-04-14",
      "research_origin": "deep_research",
      "measurement_criterion": "NASA Administrator Isaacman publicly states intent to launch lunar rockets at monthly cadence in post-Artemis II briefing"
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q1 window check-in (25%)",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -8,
      "source_id": null,
      "expected_date": "2026-11-14",
      "observed_date": null
    },
    {
      "kind": "llm_pre_event",
      "label": "Artemis III crewed lunar landing target date announced (2027)",
      "notes": "Artemis III date will reveal if 6-9 month cadence holds. Wikipedia notes ongoing slippage risk.",
      "source": "Via Satellite — Artemis III in 2027 plan",
      "status": "pending",
      "weight": 0.4,
      "ordinal": -7,
      "source_id": null,
      "confidence": 0.65,
      "source_url": "https://www.satellitetoday.com/government-military/2026/04/14/nasa-administrator-isaacman-hails-the-success-of-artemis-previews-plans-for-artemis-iii-and-iv/",
      "expected_date": "2026-11-21",
      "research_origin": "deep_research",
      "expected_date_range": {
        "to": "2027-06-30",
        "from": "2026-04-15"
      },
      "measurement_criterion": "NASA officially confirms Artemis III crewed surface landing target in 2027 with Starship HLS as lander"
    },
    {
      "kind": "scenario_signal",
      "label": "Scenario fires: Mars uncrewed: 2026 transfer window",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -6,
      "source_id": "S_MARS_2026",
      "expected_date": "2026-11-30",
      "observed_date": null
    },
    {
      "kind": "llm_pre_event",
      "label": "Commercial astronaut mission cadence reaches ≥4/year",
      "notes": "Isaacman explicitly emphasized commercial astronaut monetization. ≥4/yr meets the 'every 6-9 months' bar with 50% safety margin.",
      
... (truncated)