← Cockpit
CMQ_034predictionSemis/MemoryHBM-shortage

HBM will remain in structural shortage through at least 2027 — shortage extends multi-year despite aggressive fab expansion.

Predictor: Morgan Stanley

Prior probability
85.0%
Current probability
83.9%
evolves via intake + LBP
Conviction
5/5
Signal quality
A
Resolution
in_progress
Window
2026-01-01 – 2027-12-31
Edges in / out
0 / 0
Tickers exposed
6

Prediction text

HBM will remain in structural shortage through at least 2027 — shortage extends multi-year despite aggressive fab expansion. | HBM ASP + supply/demand tracker

Key catalyst: HBM ASP + supply/demand tracker

Watch events: HBM spot prices; HBM ASP trajectory; SK Hynix / Samsung / Micron HBM gross-margin expansion.

Resolution evidence

Status: in_progress

All three HBM vendors sold out through 2026 as of Q1 2026; 2027 booked to ~80% per trade-press reporting.

Predictor: Morgan Stanley

κ + Brier as of 2026-05-22
κ (discount)
0.633
Brier
0.0442
excellent
Hits / Misses
1 / 0
of 2 resolved
Hit rate
50.0%
Calibration plot (stated vs observed)

Evidence about this node from Morgan Stanley is multiplied by κ in /api/intake. Lower κ = less weight; floors at 0.10 (effectively silenced) and caps at 1.00 (full weight).

Reference class: fab_construction_3y

Linked via embedding similarity 0.645

Greenfield semiconductor fab construction within 3 years of announce

Base rate
58.0%
7/12 historical
Inside weight
0.435
TRF=0.81
Outside weight
0.565
pulling toward base rate
inside 96.7% → blend 83.9% -12.8pp)

Tetlock-style outside view: at TRF=1 (just predicted), outside view dominates (w_in=0.3). At TRF=0 (deadline), inside view dominates (w_in=1.0). The blend regularizes overconfident inside views toward the historical base rate.

Probability over time

5 prob_history rows
0%25%50%75%100%prior 85%2026-04-302026-05-032026-05-21
intake v2milestone miss sweeplbp propagationreference class assignedlegacy v1prior_prob (analyst seed)current = 83.9%

Milestone chain

Pre-event signals (upstream prereqs + window checkpoints) → resolution event → downstream cascades. Status/dates update from linked nodes; re-derive nightly via scripts/ops/derive_milestones.py.
Leading chain: 3 fired ✓ · 1 overdue ⏱ · 3 pending
  1. 2026-04-30hitSK Hynix declares HBM/DRAM/NAND capacity 'sold out' for 2026
    How: SK Hynix publicly states full-year 2026 HBM, DRAM and NAND capacity is sold out, on official earnings call
    Source: https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond — Tom's Hardware on Samsung/SK Hynix shortage warningsconf 99%
  2. 2026-04-30hitSamsung memory operating profit hits record on HBM-driven sales
    How: Samsung semiconductor division reports Q1 2026 operating profit ≥$30B driven primarily by HBM, exceeding all prior records
    Source: https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond — Samsung 53.7T won ($36.1B) Q1 2026 operating profitconf 99%
    Notes: HIT — Samsung semi op profit = 53.7T won ($36.1B), 94% of total quarterly profit. SK Hynix 37.6T won ($27.8B) op profit.
  3. 2026-05-11overdueQ1 window check-in (25%)
  4. 2026-04-15hitHyperscalers pre-book HBM supply multi-year ahead
    How: Public reports confirm Microsoft/Google/Meta/Amazon have pre-reserved HBM supply through 2027+ via multi-year contracts
    Source: https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyondconf 90%
  5. 2026-09-19pendingQ2 window check-in (50%)
  6. 2026-06-01 → 2027-06-30pendingHBM4 ramp by SK Hynix/Samsung at scale
    How: HBM4 generation reaches commercial volume shipment to Nvidia Vera Rubin / AMD platforms
    Source: https://www.fusionww.com/insights/blog/inside-the-ai-bottleneck-cowos-hbm-and-2-3nm-capacity-constraints-through-2027 — Fusionww AI bottleneck CoWoS+HBM analysisconf 75%
  7. 2027-01-27pendingQ3 window check-in (75%)
  8. 2027-01-01 → 2027-12-31pendingHBM ASP holds elevated through 2027 as shortage persists
    How: HBM ASPs in 2027 remain ≥80% of 2026 peak per TrendForce/DRAMeXchange tracking, confirming structural shortage thesis
    Source: TrendForce DRAMeXchange tracker; Samsung/SK Hynix earningsconf 65%

What if this resolves?

Clamp this prediction TRUE or FALSE and run a counterfactual Gibbs sample. Surfaces the predictions whose marginals shift most under that assumption.
(live posterior: 84%)

Click a button to clamp this prediction and run a Gibbs sample. Returns the predictions whose marginals shift most. ~30s per run; ideal for stress-testing "if X resolves, what else moves?"

Evidence chain

Every probability update with full Bayesian provenance — chronological, latest first
intake_event_update2026-05-21T23:15:16Z83.9%-8.0pp
intake:7afeeb9a-f217-4dd2-b910-24ff14bdfc39 bayesian_v2 inside=0.967 blend=0.839 LLR=0.939 κ=0.58 w_in=0.44 fab_construction_3y
Raw metadata
{
  "trf": 0.806626974816466,
  "kappa": 0.5833,
  "base_rate": 0.58,
  "predictor": "Morgan Stanley",
  "total_llr": 1.6094379124341,
  "bayesian_v2": true,
  "prior_logit": 2.436878392151427,
  "bayes_factor": "2.6:1 favoring",
  "blend_reason": "blend 44% inside / 56% outside (TRF=0.807, base_rate=0.580 from fab_construction_3y)",
  "inside_prior": 0.9195965822825802,
  "kappa_source": "predictor_table",
  "blend_applied": true,
  "contributions": [
    {
      "llr": 1.6094379124341,
      "kappa": 0.5833,
      "label": "Goldman explicitly upgraded shortage forecast; supply sold out through 2027 windows; HBM4E qualification slipping into 2",
      "adjusted_llr": 0.9387851343228107
    }
  ],
  "evidence_kind": "intake_event_update",
  "inside_source": "history_v2",
  "inside_weight": 0.4353611176284738,
  "outside_weight": 0.5646388823715262,
  "posterior_prob": 0.8391453880457768,
  "evidence_origin": "daily_intake",
  "llm_suggestions": [
    {
      "polarity": "corroborates",
      "status_change": "unchanged",
      "evidence_strength": "strong",
      "delta_prob_suggestion": 0.1
    }
  ],
  "posterior_logit": 3.375663526474238,
  "predictor_brier": 0.01,
  "evidence_doc_ids": [],
  "inside_posterior": 0.9669352421083208,
  "blended_posterior": 0.8391453880457768,
  "reference_class_id": "fab_construction_3y",
  "total_adjusted_llr": 0.9387851343228107,
  "predictor_n_resolved": 1
}
metadata_milestone_miss_sweep2026-05-19T22:16:06Z77.5%-1.1pp
metadata_milestone_miss_sweep bayesian_v2 n=1 inside=0.920 blend=0.775 LLR=-0.237 κ=0.58 w_in=0.43 fab_construction_3y
Raw metadata
{
  "trf": 0.8094268120556921,
  "kappa": 0.5833,
  "base_rate": 0.58,
  "predictor": "Morgan Stanley",
  "total_llr": -0.4054651081081644,
  "grace_days": 7,
  "bayesian_v2": true,
  "prior_logit": 2.6733861897109175,
  "bayes_factor": "1.3:1 against",
  "blend_reason": "blend 43% inside / 56% outside (TRF=0.809, base_rate=0.580 from fab_construction_3y)",
  "inside_prior": 0.9354378383455945,
  "kappa_source": "predictor_table",
  "n_milestones": 1,
  "blend_applied": true,
  "contributions": [
    {
      "llr": -0.4054651081081644,
      "kind": "quartile_checkpoint",
      "kappa": 0.5833,
      "label": "Q1 window check-in (25%)",
      "weight": 0.05,
      "strength": "weak",
      "confidence": null,
      "source_url": null,
      "adjusted_llr": -0.2365077975594923,
      "expected_date": "2026-05-11",
      "measurement_criterion": null
    }
  ],
  "evidence_kind": "metadata_milestone_miss_sweep",
  "inside_source": "history_v2",
  "inside_weight": 0.4334012315610155,
  "outside_weight": 0.5665987684389845,
  "posterior_prob": 0.7753949703562858,
  "posterior_logit": 2.436878392151425,
  "predictor_brier": 0.01,
  "inside_posterior": 0.9195965822825802,
  "blended_posterior": 0.7753949703562858,
  "reference_class_id": "fab_construction_3y",
  "total_adjusted_llr": -0.2365077975594923,
  "predictor_n_resolved": 1
}
intake_event_update2026-05-03T02:40:54Z78.6%-6.4pp
intake:515b84c4-6b29-4d57-8dd6-d41dac0675ec bayesian_v2 inside=0.935 blend=0.786 LLR=0.939 κ=0.58 w_in=0.42 fab_construction_3y
Raw metadata
{
  "trf": 0.8324941862584464,
  "kappa": 0.5833,
  "base_rate": 0.58,
  "predictor": "Morgan Stanley",
  "total_llr": 1.6094379124341,
  "bayesian_v2": true,
  "prior_logit": 1.734601055388106,
  "bayes_factor": "2.6:1 favoring",
  "blend_reason": "blend 42% inside / 58% outside (TRF=0.832, base_rate=0.580 from fab_construction_3y)",
  "inside_prior": 0.85,
  "kappa_source": "predictor_table",
  "blend_applied": true,
  "contributions": [
    {
      "llr": 1.6094379124341,
      "kappa": 0.5833,
      "label": "Both major HBM suppliers are explicitly pointing to supply tightness that extends beyond the current quarter and into 20",
      "adjusted_llr": 0.9387851343228107
    }
  ],
  "evidence_kind": "intake_event_update",
  "inside_source": "history_v2",
  "inside_weight": 0.4172540696190875,
  "outside_weight": 0.5827459303809125,
  "posterior_prob": 0.7864362276852449,
  "evidence_origin": "daily_intake",
  "llm_suggestions": [
    {
      "polarity": "corroborates",
      "status_change": "accelerated",
      "evidence_strength": "strong",
      "delta_prob_suggestion": 0.12
    }
  ],
  "posterior_logit": 2.673386189710917,
  "predictor_brier": 0.01,
  "evidence_doc_ids": [],
  "inside_posterior": 0.9354378383455945,
  "blended_posterior": 0.7864362276852449,
  "reference_class_id": "fab_construction_3y",
  "total_adjusted_llr": 0.9387851343228107,
  "predictor_n_resolved": 1
}
legacy v12026-04-30T16:13:50Z71.3%+0.0pp
reference_class_assigned bayesian_v2 inside=0.850 blend=0.713 w_in=0.41 fab_construction_3y
legacy v12026-04-30T01:56:50Z71.3%-13.7pp
reference_class_assigned bayesian_v2 inside=0.850 blend=0.713 w_in=0.41 fab_construction_3y

Network propagation neighbors

Top edges sorted by latest LBP cross-impact
All propagation →

No propagation data yet. Run inference/.venv/bin/python scripts/ops/run_loopy_belief_propagation.py on the droplet, or wait for the Sunday 02:00 UTC weekly cron.

Ticker exposure

6 ticker(s) linked

Beneficiaries (5)

MUNVDAAMDATEYYSTX

Prerequisites (0)

Predictions that must hit first
TypePredTitleDomainLag
No prerequisites

Dependents (0)

Predictions enabled by this
TypePredTitleDomainLag
No dependents

Validations (1)

Resolution events
Observed atStatusByNotes
2026-04-29partialthesis_timeline_v1.0_importAll three HBM vendors sold out through 2026 as of Q1 2026; 2027 booked to ~80% per trade-press reporting.

Linked documents (10)

Auto-generated by cosine similarity from Polymarket / Manifold / EDGAR / GDELT
SimSourceTitleMarket probPolarityReviewedPublished
0.609polymarketWill Haas be the 2026 F1 Constructors' Champion?1%mentionspending2025-12-08
0.602manifoldWill Indonesia's commissioned alumina refinery capacity exceed 15 Mt/yr on December 31, 2027?28%mentionspending2026-05-04
0.599polymarketWill Aston Martin be the 2026 F1 Constructors' Champion?1%mentionspending2025-12-08
0.598manifoldWill Iran's food stockpile run out before Aug 2, 2026?14%mentionspending2026-05-02
0.597polymarketWill Cadillac be the 2026 F1 Constructors' Champion?1%mentionspending2025-12-08
0.593polymarketWill Williams be the 2026 F1 Constructors' Champion?1%mentionspending2025-12-08
0.593polymarketWill Red Bull Racing be the 2026 F1 Constructors' Champion?1%mentionspending2025-12-08
0.587polymarketJerome Powell out from Fed Board by May 30?0%mentionspending2026-01-05
0.587manifoldHow many weeks will the Strait of Hormuz remain closed?mentionspending2026-05-07
0.584manifoldWill Corpus Christi "run out of water" by the end of 2030?44%mentionspending2026-04-23

Raw metadata

From Thesis_Timeline_v1.0_FINAL workbook
{
  "nia": false,
  "qty": "structural shortage",
  "mode": "FORECAST",
  "role": "Cited-Firm",
  "context": "Persistent shortage supports pricing power and ASP growth for SK Hynix, Samsung, Micron.",
  "to_year": 2027,
  "cited_by": "Synthesis report",
  "conv_cues": "structural shortage; major bank",
  "direction": "HAPPEN",
  "from_year": 2026,
  "timeframe": "through 2027",
  "conv_level": "HIGH",
  "milestones": [
    {
      "kind": "llm_pre_event",
      "label": "SK Hynix declares HBM/DRAM/NAND capacity 'sold out' for 2026",
      "source": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond — Tom's Hardware on Samsung/SK Hynix shortage warnings",
      "status": "hit",
      "weight": 0.4,
      "ordinal": -7,
      "source_id": null,
      "confidence": 0.99,
      "source_url": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond",
      "expected_date": "2026-04-30",
      "observed_date": "2026-04-30",
      "research_origin": "deep_research",
      "measurement_criterion": "SK Hynix publicly states full-year 2026 HBM, DRAM and NAND capacity is sold out, on official earnings call"
    },
    {
      "kind": "llm_pre_event",
      "label": "Samsung memory operating profit hits record on HBM-driven sales",
      "notes": "HIT — Samsung semi op profit = 53.7T won ($36.1B), 94% of total quarterly profit. SK Hynix 37.6T won ($27.8B) op profit.",
      "source": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond — Samsung 53.7T won ($36.1B) Q1 2026 operating profit",
      "status": "hit",
      "weight": 0.4,
      "ordinal": -6,
      "source_id": null,
      "confidence": 0.99,
      "source_url": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond",
      "expected_date": "2026-04-30",
      "observed_date": "2026-04-30",
      "research_origin": "deep_research",
      "measurement_criterion": "Samsung semiconductor division reports Q1 2026 operating profit ≥$30B driven primarily by HBM, exceeding all prior records"
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q1 window check-in (25%)",
      "status": "overdue",
      "weight": 0.05,
      "ordinal": -5,
      "source_id": null,
      "expected_date": "2026-05-11",
      "observed_date": null,
      "miss_emitted_at": "2026-05-19T22:16:06.586585+00:00",
      "miss_emitted_by": "metadata_milestone_sweep"
    },
    {
      "kind": "llm_pre_event",
      "label": "Hyperscalers pre-book HBM supply multi-year ahead",
      "source": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond",
      "status": "hit",
      "weight": 0.4,
      "ordinal": -4,
      "source_id": null,
      "confidence": 0.9,
      "source_url": "https://www.tomshardware.com/tech-industry/artificial-intelligence/samsung-and-sk-hynix-warn-ai-driven-memory-shortages-could-last-until-2027-and-beyond",
      "expected_date": "2026-05-17",
      "observed_date": "2026-04-15",
      "research_origin": "deep_research",
      "expected_date_range": {
        "to": "2026-09-30",
        "from": "2026-01-01"
      },
      "measurement_criterion": "Public reports confirm Microsoft/Google/Meta/Amazon have pre-reserved HBM supply through 2027+ via multi-year contracts"
    },
    {
      "kind": "quartile_checkpoint",
      "label": "Q2 window check-in (50%)",
      "status": "pending",
      "weight": 0.05,
      "ordinal": -3,
      "source_id": null,
      "expected_date": "2026-09-19",
      "observed_date": null
    },
    {
      "kind": "llm_pre_event",
      "label": "HBM4 ramp 
... (truncated)